Control Column, Airc, in Repair/Modification of
Solicitation from the Department of the Navy. Due Oct 22, 2026, 2:00 PM (UTC-4), 4 days left.
| Title as posted | 16--CONTROL COLUMN,AIRC, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0038326RBB08 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413) |
| Product or service code | 1680 |
| Posted | Sep 22, 2026 |
| Response deadline | Oct 22, 2026, 2:00 PM (UTC-4) (4 days left) |
Official notice and attachments
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|3|AS9100|AS9100|AS9100| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|INVOICE AND RECEIVING REPORT COMBO SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|SEE SCHEDULE|||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS|45 DAYS OF THE LAST DELIVERY UNDER THIS CONTRACT||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||A1, A1A| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| 1.
SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.
The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement.
SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2.
APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS GENERAL REQUIREMENTS: The Contractor shall provide at the contractors facility the necessary repair labor, new and serviceable reworked repair parts, materials and test equipmentand arrange for outside services as required to return the equipment to a serviceable condition within the calendar day shop time as specified in the delivery schedule of the contract.
SCOPE OF WORK FOR REPAIR: The scope of the work in the following subparagraphs are applicable to the latest configuration of the Government equipment.There shall be a 100% repair rate on all CLIN carcasses. Any carcass that cannot be repaired must have Defense Contract Mnagement Command (DCMC) Quality Assurance Representative(QAR) approval for disposal. Upon receipt of Government equipment the contractor shall perform incoming inspections, recording any shipping damage, and inventory components for completeness.
Units with missing parts will not be inducted until missing partsare received or unless specifically authorized by the Procurment Contracting Officer (PCO). The contractor shall advise the PCO if any portion of the required servicing is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship or otherwise not in conformance with the requirements of the contract under which such government equipment were originally furnished.
In the event that the failed assembly is found to be beyond economical repair (BER), as defined in the contract, or in the event that the Government equipment is received with one or more subassemblies missing (FOR EXAMPLE: AS ARESULT OF CANNABALIZATION BY AN AIRCRAFT OPERATING SITE),the contractor shall promptly obtain confirmation of such findings from the cognizant DCMC QAR. and upon confirmation promptly notify the PCO for authority to scrap if BER and,if missing subassemblies, proceed IAW Missing on Induction (MOI).Units with missing parts will not be inducted until missing parts are received or unless specifically authorized by the PCO.
All disassembly, repair and assembly of the Government equipment shall be IAW current engineering drawings and configuration specifications. All detail parts shall be inspected IAW the applicable repair specification and repaired or replaced as indicated. Replaced hardware shall be in accordance with the latest drawing revisions.The contractor shall provide and may use new or repaired/reworked parts which meet the requirements of the repair specification to restore the Government equipment in the delivery time specified in the contract.
Repaired/reworked parts shall be used in lieu of new whenever possible as allowed by the applicable repair spec
The description continues in the official notice.
About the buyer
The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.