Home / Navy / Other Aircraft Parts and Auxiliary Equipment Manufacturing / Notice

16--MANIFOLD ASSEMBLY,H, IN REPAIR/MODIFICATION OF

Solicitation from the Department of the Navy. Due Nov 16, 2026, 4:30 PM (UTC-4), 29 days left.

Get new Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberN0038326QHA99
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)
Product or service code1680
PostedOct 15, 2026
Response deadlineNov 16, 2026, 4:30 PM (UTC-4) (29 days left)

Official notice and attachments

Description

CONTACT INFORMATION|4|N722.12|B4d|215-697-2558|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPROT COMBO||TBD|N00383|TBD|SEE SCHEDULE|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such asemail.

The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.? For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system.?

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.

Required RTAT: 28 days after receipt of asset ?Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial?delivery commences?X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput?constraint.

1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.

Repair of: MANIFOLD ASSEMBLY,H ;014803449, 3920032-104, LATEST REV; NSN , ;014803449, 3920032-104, LATEST REV; Part Number, Shall be performed IAW: MANIFOLD ASSEMBLY,H ; 014803449, 3920032-104, LATEST REV; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2.

APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition.

3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.

3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: MANIFOLD ASSEMBLY,H ;3920032-104, 014803449, LATEST REV; P/N, ; 3920032-104, 014803449, LATEST REV; NSN, ; 3920032-104,

The description continues in the official notice.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Similar open other aircraft parts and auxiliary equipment manufacturing bids

ACTUATOR,MECHANICALDefense Logistics Agency
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OFDepartment of the Navy
Due Nov 16, 2026, 2:00 PM (UTC-4)SolicitationPosted 2026-10-16
16--SOCKET RCPT HOUSINGDepartment of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
PROCESSOR,COMMUNICA_End_Item_KC-46_NSN_6610016556120KT_PN_9D-84532-1Defense Logistics Agency
Due Oct 23, 2026, 11:59 PM (UTC-5)Sources SoughtPosted 2026-10-16
CONTROL STICK,AIRCR_End_Item_KC-46_NSN_1680016848892KT_PN_S362A001-10Defense Logistics Agency
Due Oct 23, 2026, 11:59 PM (UTC-5)Sources SoughtPosted 2026-10-16
16--SELECTOR SET,HYDRAUDefense Logistics Agency
Due Oct 27, 2026SolicitationPosted 2026-10-16