Power Unit, Gas Turb, in Repair/Modification of
Solicitation from the Department of the Navy. Due Nov 16, 2026, 2:00 PM (UTC-4), 29 days left.
| Title as posted | 28--POWER UNIT,GAS TURB, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0038326RDA41 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Turbine and Turbine Generator Set Units Manufacturing (333611) |
| Product or service code | 2835 |
| Posted | Sep 15, 2026 |
| Response deadline | Nov 16, 2026, 2:00 PM (UTC-4) (29 days left) |
Official notice and attachments
Description
CONTACT INFORMATION|4|N721.10|LPR|609-284-3898|[email protected]| COMMERCIAL ITEM PROCUREMENT NOTICE - AWARD|4| | | | | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoicing and receiving report combo type|N/A|TBD|N00383|TBD|TBD|See schedule |TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months |60 days after discovery of defect||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.
For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: 34 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s).
Total assets to be repaired monthly after initial delivery commences X/month. A throughput of ##____ per month reflectsno throughput constraint. Induction Expiration Date: 365 days after contract award date.
Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT.
Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL.
THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 .
Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Honeywell Intl; drawing number ( ;99193; ) ;3800702-1; , Revision ;Latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.
The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3.
REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhaul
The description continues in the official notice.