Home / Navy / Other Communications Equipment Manufacturing / Notice

58--MODEM,COMMUNICATION, IN REPAIR/MODIFICATION OF

Solicitation from the Department of the Navy. Due Oct 19, 2026, 2:00 PM (UTC-4), 1 day left.

Get new Other Communications Equipment Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberN0038326RSC14
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Communications Equipment Manufacturing (334290)
Product or service code7G20
PostedSep 18, 2026
Response deadlineOct 19, 2026, 2:00 PM (UTC-4) (1 day left)

Official notice and attachments

Description

CONTACT INFORMATION|4|N763.07|LPC| 771-229-0484|[email protected]| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE |SOURCE/SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| PLEASE SUBMIT QUOTE VIA EMAIL TO [email protected] BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10.

IF A FIRM FIXED PRICE (FFP) CANNOT BE DETERMINED, PLEASE INFORM THE PCO.THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES."

OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS.

1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;L3 Technologies; drawing number ( ;06401; ) ;60039194-008; , Revision ;Latest; and all details and specifications referenced therein.

1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item.

It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order.

The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: MODEM,COMMUNICATION ;60039194-008; P/N, ;7RH 1680 016429363 P8; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.

Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract.

Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.

If

The description continues in the official notice.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Similar open other communications equipment manufacturing bids

58--ENCRYPTION-DECRYPTI, IN REPAIR/MODIFICATION OFDepartment of the Navy
Due Nov 16, 2026, 2:00 PM (UTC-4)SolicitationPosted 2026-10-15
63--TRANSMITTER,RUDDER ANGDefense Logistics Agency
Due Oct 23, 2026SolicitationPosted 2026-10-15
ENCODER-DECODER,DIGDepartment of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-15
58--SWITCH,ELECTRONICDefense Logistics Agency
Due Oct 26, 2026SolicitationPosted 2026-10-15
POWER DISTRO UNITDepartment of the Navy
Due Nov 23, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-15
58--CASE,ELECTRONIC COMMUNDefense Logistics Agency
Due Oct 22, 2026SolicitationPosted 2026-10-14