Home / DLA / Power, Distribution, and Specialty Transformer Manufacturing / Notice

Power Supply

Solicitation from the Defense Logistics Agency. Due Oct 19, 2026, 4:30 PM (UTC-4), 1 day left.

Get new Power, Distribution, and Specialty Transformer Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Title as posted61--POWER SUPPLY
Solicitation numberSPRMM126QGF91
AgencyDefense Logistics Agency
OfficeSPRMM1 DLA Mechanicsburg
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Power, Distribution, and Specialty Transformer Manufacturing (335311)
Product or service code6120
PostedAug 20, 2026
Response deadlineOct 19, 2026, 4:30 PM (UTC-4) (1 day left)

Official notice and attachments

Description

INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20||||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| Solicitation Remarks PLEASE PROVIDE QUOTE WITH VALIDITY OF 60-90 DAYS

  1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, andS modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
  2. No drawings or technical data are available for this item.
  3. RFID is only required if the Ship To code identified above is listed at thewebsite with DFARS 252.211-7006 PASSIVE RFID, as the time of shipment.

Currently, there are no locations listed that require passive RFID tagging. When submitting quotes via EDI, make sure you specify any exceptions (i.e. Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements.

Changes or requests for changes after award will have consideration costs deducted on modifications. 5. If supplies will be packaged at a location different from the offeror address, the offeror shall provide the name and street address of the packaging facility.

Inspection of material will be at: ______________________________________________________________ Inspection of packaging and final acceptance of material will be at:state who the OEM is (cage code) and the part number you are offering. It is recommended that vendors register with the Navy Electronic Commerce Online (NECO) at https://www.neco.navy.mil to receive automated notifications from NECO when solicitations/amendments and contracts/modifications are issued by DLA Maritime Mechanicsburg and posted to EDA.

Contractors can view their orders, contracts and modifications at the Electronic Document Access (EDA) web tool. This web tool is located at the Procurement Integrated Enterprise Environment (PIEE) website. It is recommended that the contractor register for EDA at https://piee.eb.mil/.

Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Receiving Report and Invoices through PIEE-WAWF. INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN POC EMAIL: [email protected] \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the POWER SUPPLY .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

DOCUMENT REF DATA=MIL-STD-129 | | |R |190927|A| |02| DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The POWER SUPPLY furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;1VSR4 CPW-5783V-U003.1 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; .

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore.

If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Pa

The description continues in the official notice.

About the buyer

The Defense Logistics Agency awarded $46.2 billion in contracts in the last 12 months; its biggest suppliers were Amerisourcebergen Drug Corp, Atlantic Diving Supply, Inc. and W S Darley & Co. See what DLA is buying now.

Similar open power, distribution, and specialty transformer manufacturing bids

Regulator, Voltage andDefense Logistics Agency
Due Oct 23, 2026SolicitationPosted 2026-10-16
Cable Assembly, SpecDefense Logistics Agency
Due Oct 31, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
Cable Assembly, Spec- and Similar Replacement PartsDepartment of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
CBL Actr/Lock PWRDepartment of the Navy
Due Nov 13, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
CBL Actr/Lock PWRDepartment of the Navy
Due Nov 13, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
Cable Assembly, Spec- and Similar Replacement PartsDepartment of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16