Home / Highway, Street, and Bridge Construction / Notice

AZ BL COLO 7528(1) Burro Creek Road

Solicitation from the Federal Highway Administration, for work in Kingman, Arizona. Due Nov 17, 2026, 2:00 PM (UTC-7), 30 days left.

Get new Highway, Street, and Bridge Construction contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation number6982AF27B000002
AgencyFederal Highway Administration
Office6982AF Central Federal Lands Divisi
Notice typeSolicitation
Set-asideSmall business
Trade (NAICS)Highway, Street, and Bridge Construction (237310)
Product or service codeY1LB
Place of performanceKingman, Arizona
PostedOct 15, 2026
Response deadlineNov 17, 2026, 2:00 PM (UTC-7) (30 days left)

Official notice and attachments

Description

PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93.

The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.

Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.

The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

Similar open highway, street, and bridge construction bids

Helena - Lewis and Clark National Forest Dry Pole Pit Rock Crushing ServiceForest Service
Due Oct 22, 2026, 1:00 PM (UTC-6)SolicitationSmall businessStanford, MTPosted 2026-10-17
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4Federal Highway Administration
Due Nov 4, 2026, 2:00 PM (UTC-8)SolicitationSmall businessPort Angeles, WAPosted 2026-10-16
Z--Driveway & Parking Lot Sealcoating and StripingNational Oceanic and Atmospheric Administration
Due Oct 22, 2026, 2:00 PM (UTC-7)SolicitationSmall businessPosted 2026-10-16
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CTDepartment of the Army
Due Oct 30, 2026, 2:00 PM (UTC-4)PresolicitationSmall businessPosted 2026-10-16
Z--GOGA 336173 - Repair Conzelman RoadNational Park Service
Due Oct 29, 2026, 2:00 PM (UTC-6)SolicitationPosted 2026-10-16
Z--BRCA 310427 Southbound Shuttle StopNational Park Service
Due Nov 3, 2026, 1:00 PM (UTC-5)SolicitationPosted 2026-10-16