Home / Army / Other Heavy and Civil Engineering Construction / Notice

Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site

Presolicitation from the Department of the Army. Due Nov 20, 2026, 2:00 PM (UTC-6), 33 days left.

Get new Other Heavy and Civil Engineering Construction contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberW9128F27RA056
AgencyDepartment of the Army
OfficeW071 Endist Omaha
Notice typePresolicitation
Set-asideNone
Trade (NAICS)Other Heavy and Civil Engineering Construction (237990)
Product or service codeY1LC
PostedOct 16, 2026
Response deadlineNov 20, 2026, 2:00 PM (UTC-6) (33 days left)

Official notice and attachments

Description

This is a pre-solicitation notice. This is not a solicitation and any offers received as a result of this pre-solicitation notice will not be accepted or evaluated. USACE Omaha District intends to issue Request for Proposal (RFP) solicitation W9128F27RA056 for the following action in November 2026 with the planned proposal due date in January 2027.

PLEASE REFERENCE THE SITE VISIT INSTRUCTIONS IN THE ATTACHED DOCUMENT AND RESPOND NO LATER THAN THE DATE SHOWN. Project Title: Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site Project Location: One mile north of the town of Creede in Mineral County, Colorado NAICS Code: 237990 - Other Heavy and Civil Engineering Construction PSC Code: Y1LC - Construction of Tunnels and Subsurface Structures Set-Asides: This solicitation will be issued unrestricted; both small and large businesses are encouraged to participate.

Synopsis of Project: Construction Services for the Nelson Tunnel/Commodore Waste Rock Site (Nelson Tunnel Site or Site), the focus of the interim remedial action (IRA), consists of an abandoned underground hard rock mine and drainage tunnel with several shafts, crosscuts and drafts branching off the main tunnel. The remedial action objective of the RA is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the Nelson Tunnel.

The selected alternative for the Nelson Tunnel Interim Record of Decision (IROD) is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead within Nelson Tunnel. The IROD selected remedy is Alternative 4, Drive New Adit to Intersect Nelson Tunnel, Tunnel Rehabilitation, Install Bulkhead in Nelson Tunnel and Flow Control Structure in Commodore 5 level and include the following remedial components.

  1. Installation of a new adit south of Nelson Tunnel, to bypass the Nelson Tunnel Portal Pool.
  2. Rehabilitation of Nelson Tunnel from the bypass adit connection to the location where bulkhead construction is planned.
  3. Installation of a flow control bulkhead in Nelson Tunnel to protect against a sudden uncontrolled release through Nelson Tunnel.
  4. Installation of an accessible bulkhead flow control structure in the Commodore 5 level to protect against a sudden uncontrolled release through this level.

Additional Information can be found at the following EPA website provided in the attachment.

About the buyer

The Department of the Army awarded $83.1 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, Raytheon Company and The Boeing Company. See what Army is buying now.

Similar open other heavy and civil engineering construction bids

Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, FloridaDepartment of the Army
Due Oct 23, 2026, 1:00 PM (UTC-4)SolicitationPosted 2026-10-16
CND-846-FSHNC-HEADSTONE SETTING-Fort Sam Houston National Cemetery requires a Headstone setting contract to perform • 1. Initial and Replacement Upright Headstone and Flat Marker SettingDepartment of Veterans Affairs
PresolicitationService-disabled veteran-ownedSan AntonioPosted 2026-10-16
Jacksonville Harbor Maintenance DredgingDepartment of the Army
Due Dec 31, 2026, 3:00 PM (UTC-5)PresolicitationPosted 2026-10-16
Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2Department of the Army
PresolicitationSmall businessPosted 2026-10-16
JP Murtha Float Mooring Bitts RetrofitDepartment of the Army
Due Nov 5, 2026, 11:00 AM (UTC-5)SolicitationPosted 2026-10-16
Section 219 Chesterton Interceptor RehabDepartment of the Army
PresolicitationSmall businessPosted 2026-10-15