ELECTRONIC MODULE,S
Solicitation from the Department of the Navy. Due Oct 19, 2026, 4:30 PM (UTC-4), 1 day left.
| Solicitation number | N0010426QDB89 |
|---|---|
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Semiconductor and Related Device Manufacturing (334413) |
| Product or service code | 5963 |
| Posted | Sep 17, 2026 |
| Response deadline | Oct 19, 2026, 4:30 PM (UTC-4) (1 day left) |
Official notice and attachments
Description
CONTACT INFORMATION|4|N712.24|AES|(771) 229-0567|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoicing and receiving report (COMBO)||To Be Determined (TBD)|N00104|TBD|TBD|See schedule|See schedule|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|180 days after award| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| Please quote a firm fixed price for the full repair of the item.
If a firm fixed price cannot be provided, please quote a not to exceed price. This includesthe teardown, evaluation, inspection and full repair of the item to "like new" or "A" condition. A beyond repair (BR)/ beyond economic repair (BER) price shall also be providedin addition to the repair price at time submission of quote.
Do NOT include the cost for shipping material as the government implemented shipping system or ATAC will be shipping/delivering material. The vendor is required to comply with the Commercial Asset Visibility (CAV) of the asset(s) in this purchase order in accordance with NAVSUPWSSFA24 All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such asemail.
The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Please note that all REPAIR AWARDS will be pre-populated with the following Award Remarks: RTAT, Throughput Constraint, and Induction Expiration Date included in SUBCLIN remarks above are defined as follows: RTAT: Repair turn-around time defined as Induction start date to end date (days).
Throughput Constraint: Total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint. Induction Expiration Date: Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the Vendor and Contracting Officer.
SUBCLIN Remarks (pre-populated for each SUBCLIN) RTAT=0000 Throughput Constraint=0000/month Induction Expiration Date=000 (NTE 365 days) Please provide all of the above information with contractor's quote. Any questions should bedirected to the POC for this solicitation. THE CONTRACTING OFFICER RESERVES THE RIGHT TO EXERCISE THE OPTION QUANTITY UNDER THE OPTION SUBCLIN WITHIN 180-DAYS OF THE EFFECTIVE DATE OF THIS REPAIR OF CONTRACT AWARD.
THE CONTRACTOR WILL PROVIDE THE SAME DELIVERY TIME AND PRICE LISTED IN THE SCHEDULE. A MODIFICATION WILL BE COMPLETED AT THE TIME THE OPTION IS EXERCISED AND ALL CURRENT CONTRACT TERMS AND CONDITIONS WILL APPLY TO THE OPTION QUANTITY. \
- SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ELECTRONIC MODULE,S .
- APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
- REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ELECTRONIC MODULE,S repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below.
All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;02769 20510607-3; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; .
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor.
If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Governme
The description continues in the official notice.
About the buyer
The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.