Home / EPA / Facilities Support Services / Notice

Environmental Science Center Boiler Replacement Limited Source Justification

Updated

Justification from the Environmental Protection Agency.

Get new Facilities Support Services contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberEnvironmental_Science_Center_Boiler_Replacement_LSJ
AgencyEnvironmental Protection Agency
OfficeRegion 3 Contracting Office
Notice typeJustification
Set-asideNone
Trade (NAICS)Facilities Support Services (561210)
Product or service codeS216
PostedOct 5, 2026
Response deadlineNot stated

Official notice and attachments

Description

Limited Source Justification (LSJ) In Accordance with FAR 8.4 (RFO DEV), GSAR 538.7104-3 and EPA Policy (EPAAP) Subsection 6.3.1 (Note that this LSJ is drafted in accordance with the EPA FAR Class Deviation, RFO-2025-08) REFERENCE: PR-R3-26-00548 – Environmental Science Center Boiler Replacement 1. Identification of the agency and contracting activity. Procurement Office: US EPA Mid-Atlantic Region Agency: Environmental Protection Agency GSA Schedule Contract Number: Contract GS-21F-058AA primarily SINS 561210FAC Task Order Number: 68HE0322F0052 Contractor Name: Native Energy & Technology, Inc. Government Estimate/Estimated Contract Value: $8,071,205.09 Description of Requirement: EPA Region 3 intends to award a Task Order (TO) modification to increase the ceiling of this award by $427,038.68 to allow for the replacement of boiler tubes for three (3) boilers and two (2) boiler controllers for the Environmental Science Center.

2. Nature and/or description of the action being approved. General Services Acquisition Regulation (GSAR) 538.7104-3(b)(1)(i) Limited sources justification and approval.

An increase of the ceiling to TO 68HE0322F0052 with Native Energy & Technology, Inc. under U.S. General Services Administration (GSA) Federal Supply Schedule (FSS) GS-21F-058AA. This is an urgent and compelling requirement to replace the tubes in three (3) boilers and controllers in two (2) boilers that provide heat to the Environmental Science Center (ESC). Orders placed under Federal Supply Schedules are exempt from the requirements in Part 6.

However, an ordering activity must justify its action when restricting consideration in accordance with General Services Acquisition Regulation (GSAR) 538.7104-3. Circumstance justifying limiting the source: GSAR 538.7104-3(b)(1)(i) The Government’s need to maintain working building boilers for the ESC represents an unusual and compelling urgency that precludes full and open competition and delay in award of a contract would result in unacceptable delays and serious injury, financial or other, to the Government.

3. Description of the supplies or services required to meet the agency’s needs, including the estimated value. This requirement is for Operations and Maintenance (O&M) contract support for facility engineering, system maintenance, repair, minor improvements, snow removal, and facility services.

This TO was awarded with a one-year base and four (4) one-year option periods. This TO includes an ODC Sub-CLIN for Over and Above Work for materials and supplies and services greater than $500.00 for the base and four (4) one-year option periods. 4.

Identification of the statutory authority permitting other than full and open competition. This acquisition is conducted under the authority of the Multiple-Award Schedule Program (41 U.S.C. 152(3), Competitive Procedures, and 40 U.S.C. 501, Services for Executive Agencies). Specifically, GSAR 538.7104-3, titled “Sole Source Justifications,” GSAR 538.7104-3(b)(1)(i), The need is of such unusual urgency that following the procedures would result in unacceptable delays in filling that need applies.

5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires using the authority cited. Using this task order’s ODC Sub-CLIN to perform over and above work would enable the Government to address the urgent and compelling need to replace the boiler tubes and controls before the winter months.

Completing this work before winter is necessary to ensure a safe and continuously heated workspace for ESC employees and prevent irreparable damage to the ESC infrastructure. 6. A description of efforts to solicit as many offers as practicable or exception.

An unusually urgent and compelling need for EPA Region 3’s ESC boiler repair services exists for this requirement. Following competitive Federal Supply Schedule ordering procedures would result in unacceptable delays per GSAR 538.7104-3(b)(1)(i). It is anticipated that it would take a minimum of 150 days to conduct a competitive acquisition which would threaten Environmental Science Center operations and jeopardize EPA federal emergency response efforts.

7. A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable. Native obtained multiple informal quotes on behalf of the Government for the services to replace the boiler tubes.

Only one (1) vendor, Gary Anderson HVAC was capable of providing the replacement controllers. Below is an abstract of those quotes: Boiler Tube Replacement American Combustion Industries: Rocket Shop LLC: Gary Anderson HVAC: Boiler Controller Replacement Gary Anderson HVAC: The price of redacted for the boiler tube replacement has been determined fair and reasonable due to adequate price competition.

The price of $157,896.68 for the replacement of the boiler controllers has been determined fair and reasonable due to historical pricing. 8. The market research conducted and the results or a statement of the reason market research was not conducted.

Market research was conducted to identify available sources capable of performing the required boiler tube and boiler controller replacement services within the timeframe necessary to support the ESC’s operations. The Government reviewed the capabilities of potential vendors and obtained multiple informal quotations for the boiler tube replacement. American Combustion Industries, Rocket Shop LLC, and Gary Anderson HVAC provided quotations for the boiler tube replacement.

Gary Anderson HVAC was the only vendor identified as capable of providing the required replacement controllers. The quotations and available historical pricing were also reviewed to support the determination that the anticipated costs were fair and reasonable. Based on the urgent need to complete the work before the winter months and the results of the market research, the Government determined that the proposed approach would provide the re

The description continues in the official notice.

About the buyer

The Environmental Protection Agency awarded $1.3 billion in contracts in the last 12 months; its biggest suppliers were Kemron/Arrowhead JV, LLC, General Dynamics Information Technology, Inc. and Eastern Research Group Inc. See what EPA is buying now.

Similar open facilities support services bids

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock and Dam and Lake Seminole Project, Florida and Georgia
Department of the Army
Due Nov 2, 2026, 2:00 PM (UTC-5) · 14 days left
Solicitation · Small business · Posted Oct 16, 2026
Installation Support Services at DLA Distribution San Joaquin CA (DDJC)
Defense Logistics Agency
Due Oct 30, 2026, 1:00 PM (UTC-4) · 11 days left
Solicitation · Women-owned · Posted Oct 16, 2026
Fort Leonard Wood BASOPS Solicitation
Department of the Army
Due Nov 9, 2026, 2:00 PM (UTC-6) · 21 days left
Solicitation · 8(a) · Posted Oct 15, 2026
USAG-Stuttgart Base Operations
Department of the Army
Due Oct 22, 2026, 2:00 PM (UTC-4) · 3 days left
Presolicitation · Stuttgart · Posted Oct 15, 2026
Chiller Tube Cleaning
Department of Veterans Affairs
Due Oct 21, 2026, 8:00 AM (UTC-4) · 2 days left
Sources Sought · Veteran-owned · Columbia · Posted Oct 14, 2026
FY26 Lifeguard and Pool Maintenance Services (B+ OPT)
Department of Veterans Affairs
Due Oct 20, 2026, 10:00 AM (UTC-4) · 1 day left
Solicitation · Posted Oct 11, 2026