Home / Army / Other Aircraft Parts and Auxiliary Equipment Manufacturing / Notice

Increase Contract ceiling on W58RGZ-24-D-0065

Updated

Sources Sought from the Department of the Army, for work in Huntsville, Alabama. Due Oct 20, 2026, 11:00 AM (UTC-5), 1 day left.

Get new Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberW58RGZ24D0065CeilingIncrease
AgencyDepartment of the Army
OfficeW6QK Acc-Rsa
Notice typeSources Sought
Set-asideNone
Trade (NAICS)Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)
Product or service code1680
Place of performanceHuntsville, Alabama
PostedOct 5, 2026
Response deadlineOct 20, 2026, 11:00 AM (UTC-5) (1 day left)

Official notice and attachments

Description

This is a notification that the Army Contracting Command, Redstone Arsenal, AL, intends to increase the contract ceiling from $388,588,385 to approximately $$685,398,349 on existing contract W58RGZ-24-D-0065 with L3 Technologies, Inc., Communications Systems-West, a subsidiary of L3Harris Technologies Inc. (L3T), Commercial and Government Entity (CAGE) Code: 06401, 640 N 2200 W, Salt Lake City, UT 84116-2925.

An increase to the contract ceiling will allow for the purchase of Manned/Unmanned Teaming (MUMT) hardware, as well as technical and engineering support for the Apache Attack Helicopter (AAH) to support United States Government (USG) operations and Foreign Military Sales (FMS). This increase is primarily necessary due to increases in quantities of projected hardware procurements: Coyote Modem: The original quantity (qty) was based on pure fleeting/full fielding to USG AC, spares and a small qty of Five Eye (FVEY) buys.

The revised IGCE accounts for the Coyote Modems that were procured by the USG, includes the remainder that would need to be procured to pure fleet and some quantity that would be procured by FVEY. The USG did not have a Coyote Modem-Coalition (CM-C) variant at the time the original IGCE was prepared and could not account for FMS procurement then. This proposed ceiling increase accounts for those requirements.

RoadRunner: At the time the original IGCE was prepared RoadRunner had not been developed; therefore no cost was available. This proposed ceiling increase accounts for actual cost and updated requirements for the USG and FMS partners. Rover6i: The original IGCE planned to buy Rover6Si for ACME kits at very low quantities.

The revised IGCE assumes quantities equal to CM-C quantities and assumes that R6Si can be installed in the AC. MUMT-X AAG-X subsystem, KuC Omni Ant Assy and KuC RFE Assy: The original IGCE quantity used was 200. This was based on projected USG and FMS partner orders.

The revised IGCE assumes an increase in quantity to 648/432. ACME kit: At the time the original IGCE was prepared ACME kit had not been developed; therefore no cost was available. This proposed ceiling increase accounts for actual cost and updated requirements for the USG and FMS partners.

CFSR support: FMS partners’ CFSR utilization is projected to be significantly higher in Years 3-5 than previously estimated. Additional costs associated with program support, production, and integration are also included in the overall ceiling increase. As stated in the ACC-RSA original Justification and Approval (J&A) for Other than Full and Open Competition dated 10 August, 2022, L3T is the only source that possesses the TDP suitable for full and open competition, corporate knowledge and technical expertise to provide the MUMT-X hardware, as well as technical and engineering support for the quick reaction services and capabilities for this requirement.

No other contractor has the resources to perform the required technical and engineering support for the AAH-64 MUMT/MUMT-X sensor systems in the required timeframe. However, this Sources Sought serves as the Government's open for competition notice as required by DFARS PGI 206.302-1(d) and the notice of proposed contract action as required by FAR 5.201. This action will result in an increase in contract ceiling to the existing contract identified above which is necessary to allow for continuity of critical contractor services.

Electronic transmissions must not exceed 5 megabytes and responses in the form of white papers should be limited to 10 pages in length and may include technical specifications and product sheets as deemed necessary. All material submitted in response to this RFI must be unclassified. All responses must be received via email no later than 20 October 2026, 11:00 a.m. Central Time and should be submitted to Contract Specialist, Tristan Mitchell; at [email protected], AND Contracting Officer, James Pattullo; at [email protected].

No telephone inquiries will be accepted.

About the buyer

The Department of the Army awarded $83.1 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, Raytheon Company and The Boeing Company. See what Army is buying now.

Similar open other aircraft parts and auxiliary equipment manufacturing bids

Clock, Panel
Defense Logistics Agency
Due Oct 26, 2026, 11:59 PM (UTC-5) · 7 days left
Solicitation · Ozark, AL · Posted Sep 24, 2026
Spares for AH-64 Apache of NOUN: Insulation, Thermal, PN:7-511141641-059, NSN:1560-01-679-4035
Department of the Army
Due Oct 27, 2026, 11:00 AM (UTC-5) · 8 days left
Presolicitation · Huntsville, AL · Posted Sep 23, 2026
Lever, Remote Control; NSN: 1680-01-264-2104 supporting the AH-64 Apache Airframe
Department of the Army
Due Oct 30, 2026, 3:00 PM (UTC-5) · 11 days left
Sources Sought · Redstone Arsenal, AL · Posted Aug 12, 2026
V250 and TMS Kit
Department of the Army
Due Dec 1, 2026, 5:00 PM (UTC-6) · 43 days left
Presolicitation · Redstone Arsenal, AL · Posted Nov 17, 2025
Balance Weight, Elev
Defense Logistics Agency
Due Oct 26, 2026 · 7 days left
Solicitation · Service-disabled veteran-owned · Posted Oct 18, 2026
Gauge, Pressure, Airc
Defense Logistics Agency
Due Nov 2, 2026 · 14 days left
Solicitation · Small business · Posted Oct 18, 2026