Infrastructure Pilot Excavator (IPEx)
Justification from the National Aeronautics and Space Administration, for work in Orlando, Florida.
| Solicitation number | 80SSC018D0012_80KSC025F7018_P00002 |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA Kennedy Space Center |
| Notice type | Justification |
| Set-aside | None |
| Trade (NAICS) | Industrial Building Construction (236210) |
| Product or service code | Y1QA |
| Place of performance | Orlando, Florida |
| Posted | Oct 6, 2026 |
| Response deadline | Not stated |
Official notice and attachments
Description
Modification to existing Contract. Excavation of existing soil to produce a pit 45' wide x 90' long x 4' deep, not including sloped side walls inside the IPEx relocatable building M7-1062. Includes install of liner with landfill-grade impervious 60 Mil HDPE Text Liner system; Backfill with W12 granite screenings at 2% moisture content or less; and cover remaining top surface (60' wide x 110' long) with at least 18” of W12 granite screenings at 2% moisture content or less.
About the buyer
The National Aeronautics and Space Administration awarded $16.3 billion in contracts in the last 12 months; its biggest suppliers were California Institute Of Technology, The Boeing Company and Blue Origin, LLC. See what NASA is buying now.