Home / Navy / Other Metal Valve and Pipe Fitting Manufacturing / Notice

LOWER STEM

Solicitation from the Department of the Navy. Due Oct 30, 2026, 4:30 PM (UTC-4), 12 days left.

Get new Other Metal Valve and Pipe Fitting Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberN0010426QTC56
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Metal Valve and Pipe Fitting Manufacturing (332919)
Product or service code4820
PostedSep 30, 2026
Response deadlineOct 30, 2026, 4:30 PM (UTC-4) (12 days left)

Official notice and attachments

Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[email protected]| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin.

This RFQ is for a buy. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execuution. Verify nomenclature, part number, and NSN prior to responding.

Government source inspection is required. Unit Price:__________ FIRM Total Price:__________ FIRM Procurement Turnaround Time (PTAT) :__________ Awardee CAGE: __________ Inspection & Acceptance CAGE, if not at source:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________ Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide a letter/official email from the OEM confirming your company is an authorized distributor of their items.

The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-7 herein.

Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the LOWER STEM .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

DOCUMENT REF DATA=MIL-STD-129 | | |R |190927|A| |02| DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The LOWER STEM furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;04613 140-205-040-661-001 04613 D641-30BITEM4; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; .

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore.

If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.

3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.

The contractor's request shall expla

The description continues in the official notice.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Similar open other metal valve and pipe fitting manufacturing bids

48--VALVE,BALL 1.000NPSDepartment of the Navy
Due Nov 16, 2026, 5:00 PM (UTC-5)SolicitationPosted 2026-10-16
VALVE ASSEMBLY,MANIDepartment of the Navy
Due Nov 9, 2026, 2:00 PM (UTC-5)SolicitationPosted 2026-10-16
STR FLG END FTGDepartment of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
VALVE,GLOBEDepartment of the Navy
Due Nov 6, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
UNION NUTDepartment of the Navy
Due Oct 30, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16
PARTS KIT,BALL VALVDepartment of the Navy
Due Nov 13, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-16