Home / Navy / Ship Building and Repairing / Notice

Maintenance, Repair and Preservation of YT-811

Solicitation from the Department of the Navy. Due Oct 23, 2026, 2:00 PM (UTC-7), 5 days left.

Get new Ship Building and Repairing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberN4523A26Q1012
AgencyDepartment of the Navy
OfficePuget Sound Naval Shipyard Imf
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Ship Building and Repairing (336611)
Product or service codeJ019
PostedSep 22, 2026
Response deadlineOct 23, 2026, 2:00 PM (UTC-7) (5 days left)

Official notice and attachments

Description

The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) intends to award a stand-alone Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of YT-811. The YT-811 characteristics are Length: 90 FT, Width: 38FT 5IN, Age: 4 Years, Hull Type: Steel, Draft: 16 FT, Full Displacement: 494 L Tons and Light Load: 438 L Tons.

The Contractors facility must possess the capability of YT-811 with the dimensions as stated above. To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA.

Scope Overview: Coordinate with the Contracting Officer, via the SUPERVISOR to deliver the vessel to the Contractors facility. The Government will transport the vessel to the Contractors repair facility. Upon docking vessel, wash, and clean vessel.

Replace zinc anodes. Blast and preserve underwater hull and freeboard, bulwarks, and handrails. Blast and preserve main deck, 1st deck, and 2nd deck non-skid, FME all polished stainless steel surfaces.

Perform hull and freeboard Ultrasonic Test (UT) inspections. Perform hull and freeboard, main deck, 1st deck, and 2nd deck Visual Inspections (VT). Repair hull and winch valves.

Repair deckhouse expansion joint. Test and preserve CHT, ballast, potable water, fuel oil, waste oil and day tanks. Accomplish Mast Lighting and Deckhouse Lighting Repairs.

Replace all placards and labels on main, 1st and 2nd decks. Replace deck winch, mast, and brow systems hydraulic hoses. Accomplish winch control piping modification (YT-0104D).

Overhaul Mast hydraulic ram, replace pins and bushings. Undock the vessel. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the SUPERVISOR.

Upon completion of all work the Government will take custody of the vessel. Specific details of all work items and tasks required by this Statement of Work described in this Scope Overview are included in section 3.0 of this Statement of Work. The YT-811 will be ready for pick up on or after 2 March 2027.

Refer to page 1 Request for Quote (RFQ) of the Solicitation regarding desired and required delivery information. This is full and open competition. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts.

Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Similar open ship building and repairing bids

USS Air Craft Carriers, Nuclear Propulsion (CVN) Ship Repair, Maintenance, Modernization, and Overhaul FY27 FFP IDIQ FOLLOW-ONDepartment of the Navy
Due Oct 31, 2026, 2:00 PM (UTC+9)PresolicitationPosted 2026-10-16
CVN IDIQ FOLLOW-ONDepartment of the Navy
Due Oct 31, 2026, 2:00 PM (UTC+9)PresolicitationPosted 2026-10-16
Fire Watch Services SRF-JRMC YokosukaDepartment of the Navy
Due Oct 30, 2026, 10:00 AM (UTC+9)SolicitationPosted 2026-10-16
USNS PATUXENT (T-AO 201) FY27 Mid-Term AvailabilityDepartment of the Navy
Due Dec 1, 2026, 1:00 PM (UTC-5)PresolicitationSmall businessPosted 2026-10-15
**Big Blue 3 MAC** Metal printer alterations will be completed onboard USS IWA JIMA (LHD 7), USS BOXER (LHD 4), LHD 8 (USS MAKIN ISLAND)Department of the Navy
Due Nov 2, 2026, 1:00 PM (UTC-5)SolicitationPosted 2026-10-15
USNS KANAWHA (T-AO 196) MTA FY27Department of the Navy
Due Dec 3, 2026, 3:00 PM (UTC-5)SolicitationSmall businessPosted 2026-10-15