Home / Navy / Aircraft Engine and Engine Parts Manufacturing / Notice

TURBOCHARGER,LEFT

Solicitation from the Department of the Navy. Due Nov 16, 2026, 4:30 PM (UTC-4), 29 days left.

Get new Aircraft Engine and Engine Parts Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberN0010427QXA07
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Aircraft Engine and Engine Parts Manufacturing (336412)
Product or service code2950
PostedOct 15, 2026
Response deadlineNov 16, 2026, 4:30 PM (UTC-4) (29 days left)

Official notice and attachments

Description

CONTACT INFORMATION|4|N774.7|GYK|771-229-0887|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email protected].

B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting. C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.

Verify nomenclature, part number, and NSN prior to responding. D. Only a firm-fixed (FFP), not-to-exceed (NTE), or estimated (EST) price for the REPAIR of the subject item(s) will be accepted. Quotes limited to test and evaluation (T&E) will NOT be accepted.

The quoted price MUST be for the REPAIR of the item(s). E. Must adhere to IUID requirements of DFARS 252.211-7003 F. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization.

G. The Government is requesting a Repair Turnaround Time (RTAT) of: 79 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.

Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #).

A throughput of "0" (zero) per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

H. IMPORTANT NOTE: Reconciliation Price Reduction: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance.

Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit/per month the contractor does not meet the RTAT: $___________, up to a maximum of: $__________. (vendor is to fill in amount) I. Your quote MUST include the following information for justification purposes: - Repair unit price ________________ - Total price________________ - Repair Turnaround Time (RTAT) _____________ days NOTE: If you are not quoting the Government's Requested Repair Turnaround Time (RTAT) or sooner, you must provide your company's capacity constraints below: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - Indicate Price Type: Firm-Fixed-Price _____ Not-to-Exceed (Ceiling Price) _____ Estimated _____ - New unit price_________________ - New unit delivery lead time____________ days - T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR/BER, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. - The T&E

The description continues in the official notice.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Similar open aircraft engine and engine parts manufacturing bids

VALVE,FUEL SYSTEMDefense Logistics Agency
Due Nov 15, 2026, 4:00 PM (UTC-6)SolicitationPosted 2026-10-16
New Manufactured Material, NSN 2840-01-533-0151 PR (AMC 3V)Defense Logistics Agency
Due Dec 2, 2026, 4:00 PM (UTC-6)PresolicitationPosted 2026-10-16
F108 Outer Nozzle Support RepairDepartment of the Air Force
Due Oct 30, 2026, 5:00 PM (UTC-5)SolicitationPosted 2026-10-16
New Manufacture Material, NSN 2995010074738OK (AMC 4B)Defense Logistics Agency
Due Dec 2, 2026, 4:00 PM (UTC-6)PresolicitationPosted 2026-10-16
New Manufacture Material, NSN 2840016760196PR (AMC 3R)Defense Logistics Agency
Due Dec 2, 2026, 4:00 PM (UTC-6)PresolicitationPosted 2026-10-16
29--FUEL CONTROL,MAIN,T, IN REPAIR/MODIFICATION OFDepartment of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4)SolicitationPosted 2026-10-15