612A4-27-018 | Replace B650 3rd and 2nd Flooring

Solicitation from the Department of Veterans Affairs, for work in Mather, California. Due Nov 12, 2026, 12:00 PM (UTC-8), 25 days left.

Get new Commercial and Institutional Building Construction contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Title as postedZ2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
Solicitation number36C26127Q00260001
AgencyDepartment of Veterans Affairs
Office261-Network Contract Office 21 (36C261)
Notice typeSolicitation
Set-asideService-disabled veteran-owned
Trade (NAICS)Commercial and Institutional Building Construction (236220)
Product or service codeZ2DA
Place of performanceMather, California
PostedOct 14, 2026
Response deadlineNov 12, 2026, 12:00 PM (UTC-8) (25 days left)

Official notice and attachments

Description

VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS).

Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR).

Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability.

The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project.

The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel.

Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement.

Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW.

All work shall comply with all applicable federal, state, local and VA regulations and requirements. Scope of Work: The contractor shall replace approximately 38,000 square feet (SF) of carpet and luxury vinyl tile throughout Building 650 3rd and 2nd Floors as shown in Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement and Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring.

Resilient wall base shall also be replaced at all spaces that will receive new flooring. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements.

The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring shows current carpet with red lines across rooms or spaces that will remain the same (no change in these).

Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement states room by room current flooring and resilient base to be installed. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements.

The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall remove and install new accessories associated with the flooring.

Carpet and luxury vinyl tiles to include, but not limited to, subfloors, carpet tack strips, carpet padding, and vinyl glue. The contractor shall paint all rooms located on the 2nd and 3rd floors of Building 650 per specification Section 09 06 00, Schedule of Finishes. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements.

The proposed product shall be similar in appearance and shall match the color, texture, pa

The description continues in the official notice.

About the buyer

The Department of Veterans Affairs awarded $84.2 billion in contracts in the last 12 months; its biggest suppliers were Optum Public Sector Solutions, Inc., Mckesson Corporation and Triwest Healthcare Alliance Corp. See what VA is buying now.

Similar open commercial and institutional building construction bids

Amendment 0002 Y1DZ--36C261-28-AP-0022 | 612-27-1-6009-0001 | Construct Modular Imaging Center in Stockton | 612A4-CSI-002Department of Veterans Affairs
Due Dec 4, 2026, 12:00 PM (UTC-8)SolicitationService-disabled veteran-ownedFrench Camp, CAPosted 2026-10-15
Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGBDepartment of the Army
Due Nov 13, 2026, 12:00 PM (UTC-8)SolicitationSmall businessMoffett Field, CAPosted 2026-10-15
IDIQ JOC for General Construction Projects at Government Installations Within Naval Facilities Engineering Systems Command Southwest the Metropolitan SAN Diego (Naval Bases SAN Diego, Point Loma, Coronado and Marine Corps Air Station (Mcas) Miramar, CalifDepartment of the Navy
Due Oct 28, 2026, 2:00 PM (UTC-7)PresolicitationWomen-ownedCAPosted 2026-10-14
Schwartz USCH Ceiling Reinforcement and RetexturingPublic Buildings Service
Due Oct 29, 2026, 4:00 PM (UTC-7)PresolicitationSmall businessSan Diego, CAPosted 2026-10-14
Schwartz USCH Ceiling ReinforcementPublic Buildings Service
Due Oct 29, 2026, 4:00 PM (UTC-7)PresolicitationSmall businessSan Diego, CAPosted 2026-10-14
GAOA Facilities, Barracks Inyo NFForest Service
Due Oct 27, 2026, 12:00 PM (UTC-7)SolicitationSmall businessLone Pine, CAPosted 2026-10-09