Home / Navy / Other Metal Valve and Pipe Fitting Manufacturing / Notice

Valve Assembly, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Nov 16, 2026, 4:30 PM (UTC-4), 27 days left.

Be among the first to see new Other Metal Valve and Pipe Fitting Manufacturing contracts
Only new notices that match, once a day. $29 a month or $290 a year, cancel any time.
Title as posted48--VALVE ASSEMBLY, IN REPAIR/MODIFICATION OF
Solicitation numberN0038327QSA11
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Metal Valve and Pipe Fitting Manufacturing (332919)
Product or service code4810
PostedOct 19, 2026
Response deadlineNov 16, 2026, 4:30 PM (UTC-4) (27 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

This solicitation is for the repair of NSN: 4810 016740466, PN: 2651-278-26, VALVE ASSEMBLY, QTY 4. Please submit quote to [email protected] by the due date indicated on page 1. 1. SCOPE 1.1 .

Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;SAFRAN ELECTRONICS & DEFENSE AVIONICS LLC; drawing number ( ;879B2; ) ;2651-278-26; , Revision ;latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: VALVE ASSEMBLY ;2651-278-26; P/N, ;7RH 4810 016740466 P8; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.

Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract.

Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repa

Clauses in this notice (14):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Metal Valve and Pipe Fitting Manufacturing contracts right now

There are 156 open government contract opportunities in this trade (NAICS 332919), 62 posted in the last 7 days; 9% are set aside for small businesses. The agencies buying the most are Department of the Navy and Defense Logistics Agency. Most of the work with a stated place is in Maine, California and Massachusetts. A notice in this trade gives a median of 29 days from posting to deadline; this one gives 28 days.

All open other metal valve and pipe fitting manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Grant Creek AOPs
Department of Agriculture
Drafting Solicitation · Award FY 2026 · $500K - $999K · Unknown

Recent awards in this trade

From the award notices agencies publish.

Similar open other metal valve and pipe fitting manufacturing bids

Flange
Defense Logistics Agency
Due Oct 22, 2026, 12:00 PM (UTC-10) · 2 days left
Solicitation · Small business · Posted Oct 19, 2026
Coupling Assembly, Hose
Defense Logistics Agency
Due Oct 30, 2026 · 10 days left
Solicitation · Posted Oct 19, 2026
Valve, Check
Defense Logistics Agency
Due Oct 30, 2026 · 10 days left
Solicitation · Posted Oct 19, 2026
Valve, Solenoid, in Repair/Modification of
Department of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Oct 19, 2026
Valve, Safety Relief
Defense Logistics Agency
Due Nov 16, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Oct 19, 2026
VLV, DIAPH Control
Department of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Oct 19, 2026