Home / Navy / Bare Printed Circuit Board Manufacturing / Notice

NRP, Printe DBRD Ass, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Oct 30, 2026, 4:30 PM (UTC-4), 9 days left.

Be among the first to see new Bare Printed Circuit Board Manufacturing contracts
Only new notices that match, once a day.
Title as posted59--NRP,PRINTE DBRD ASS, IN REPAIR/MODIFICATION OF
Solicitation numberN0038327QSA01
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Bare Printed Circuit Board Manufacturing (334412)
Product or service code5998
PostedOct 20, 2026
Response deadlineOct 30, 2026, 4:30 PM (UTC-4) (9 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

This solicitation is for the repair of NIIN 016636129, PN 8430022-502, QTY 8. A delivery order will be issued under BOA N00383-25-G-NP01. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.

1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: NRP,PRINTE DBRD ASS ;5998016636129; NSN , ;8430022-502; Part Number, Shall be performed IAW: NRP,PRINTE DBRD ASS ;With most current plublications and practies; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer.

All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. Applicable documents - not applicable 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item.

It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order.

The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: NRP,PRINTE DBRD ASS ;8430022-502; P/N, ;5998016636129; NSN, ;To be performed with most current tech publications and common practices; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.

Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract.

Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.

If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

3.4.2 References on

Clauses in this notice (11):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 334412, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for bare printed circuit board manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Bare Printed Circuit Board Manufacturing contracts right now

There are 144 open government contract opportunities in this trade (NAICS 334412), 22 posted in the last 7 days; 15% are set aside for small businesses. The agencies buying the most are Department of the Navy and Defense Logistics Agency. Most of the work with a stated place is in California, Pennsylvania and New Jersey. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 10 days.

All open bare printed circuit board manufacturing contracts

Recent awards in this trade

From the award notices agencies publish.

Similar open bare printed circuit board manufacturing bids

Circuit Card Assemb
Department of the Navy
Due Nov 4, 2026, 4:30 PM (UTC-4) · 14 days left
Solicitation · Posted Oct 20, 2026
Card, Signal Process
Department of the Navy
Due Oct 27, 2026, 4:30 PM (UTC-4) · 6 days left
Solicitation · Posted Oct 20, 2026
Circuit Card Assemb
Defense Logistics Agency
Due Oct 30, 2026, 4:30 PM (UTC-4) · 9 days left
Solicitation · Posted Oct 20, 2026
Controller, HMI
Defense Logistics Agency
Due Oct 30, 2026, 4:30 PM (UTC-4) · 9 days left
Solicitation · Posted Oct 20, 2026
CCA, Discrete Multi
Defense Logistics Agency
Due Oct 30, 2026, 4:30 PM (UTC-4) · 9 days left
Solicitation · Posted Oct 20, 2026
TTAP SBC
Defense Logistics Agency
Due Nov 6, 2026, 4:30 PM (UTC-4) · 16 days left
Solicitation · Posted Oct 20, 2026