Home / Navy / Current-Carrying Wiring Device Manufacturing / Notice

Power Supply Assemb, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Oct 26, 2026, 4:30 PM (UTC-4), 6 days left.

Be among the first to see new Current-Carrying Wiring Device Manufacturing contracts
Only new notices that match, once a day. $29 a month or $290 a year, cancel any time.
Title as posted61--POWER SUPPLY ASSEMB, IN REPAIR/MODIFICATION OF
Solicitation numberN0010426QYAHY
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Current-Carrying Wiring Device Manufacturing (335931)
Product or service code6130
PostedOct 19, 2026
Response deadlineOct 26, 2026, 4:30 PM (UTC-4) (6 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

The purpose of this amendment is to reduce the quantity to 2. The resultant award of this solicitation will be issued bilaterally,requiring the contractor's written acceptance prior to execution. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods such as email.

The Government's acceptance of the contractor'sproposal constitutes a bilateral agreement to "issue" contractual documents asdetailed herein. If the offeror is not the Original End Manufacturer (OEM) of the materialcalled out in the requirement, the OEM must be stated (Company Name and CAGE)and the offeror must provide a signed letter of authorization as a distributoron the OEM's letterhead.

If requirement will be packaged at a location different from the offeror'saddress, the offeror shall provide the name, street address, and CAGE of thefacility. Any contract awarded as a result of this solicitation will be DO certifiedfor national defense under the Defense Priorities and Allocations System(DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense,Emergency Preparedness, and Energy Program Use, shall be inserted insolicitations when the contract to be awarded shall be a rated order.

For repairs only:Once evaluation of the item(s) is complete, the government requires that submission of a cost proposal that reflects the actual costs, and the extent of repair work required for the item(s). Send the Proposal to Helen Carmelo, Code N741.P14, Email: [email protected]. \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the POWER SUPPLY ASSEMB .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order.

3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The POWER SUPPLY ASSEMB repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No. ;26581 401000-001; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.

When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.

When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts ar

Contact: N741.P14 · HW2 · See Email · [email protected]

Clauses in this notice (17):

Documents referenced (2): MIL-STD-129, MIL-STD-1686

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 335931, a business counts as small if it has no more than 600 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for current-carrying wiring device manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Current-Carrying Wiring Device Manufacturing contracts right now

There are 117 open government contract opportunities in this trade (NAICS 335931), 35 posted in the last 7 days; 37% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of Energy. Most of the work with a stated place is in Iowa, Maryland and New Mexico. A notice in this trade gives a median of 15 days from posting to deadline; this one gives 7 days.

All open current-carrying wiring device manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

IMT SCADA Switch & Router Replacement - Delivery Order (LCB)
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Firm Fixed Price
NBAF - Electrical Distribution Breakers
Department of Agriculture
Evaluation Stage · Award FY 2026 · $250K - $499K · Firm Fixed Price
WY SE Replace Surge Arrestors
Department of the Interior
Award FY 2026 · Below $150K · Small Business · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open current-carrying wiring device manufacturing bids

Rectifier Assembly, Met
Defense Logistics Agency
Due Oct 30, 2026 · 10 days left
Solicitation · Posted Oct 19, 2026
Cable Assembly, Radio F
Defense Logistics Agency
Due Oct 30, 2026 · 10 days left
Solicitation · Posted Oct 19, 2026
Power Supply
Department of the Navy
Due Nov 16, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Oct 19, 2026
Power Supply
Department of the Navy
Due Oct 26, 2026, 4:30 PM (UTC-4) · 6 days left
Solicitation · Posted Oct 19, 2026
Power Supply
Defense Logistics Agency
Due Oct 30, 2026, 4:30 PM (UTC-4) · 10 days left
Solicitation · Posted Oct 19, 2026
Power Supply
Defense Logistics Agency
Due Nov 16, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Oct 19, 2026