Home / Army / Oil and Gas Pipeline and Related Structures Construction / Notice

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Updated

Solicitation from the Department of the Army. Due Jan 25, 2027, 2:00 PM (UTC+9), 97 days left.

Be among the first to see new Oil and Gas Pipeline and Related Structures Construction contracts
Only new notices that match, once a day. $29 a month or $290 a year, cancel any time.
Solicitation numberW912HV26RA009
AgencyDepartment of the Army
OfficeW2SN Endist Japan
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Oil and Gas Pipeline and Related Structures Construction (237120)
Product or service codeY1NA
PostedOct 19, 2026
Response deadlineJan 25, 2027, 2:00 PM (UTC+9) (97 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster.

Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank.

A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building.

The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions.

The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 237120, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for oil and gas pipeline and related structures construction work, who also hold Army contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Army awarded $83.1 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, Raytheon Company and The Boeing Company. See what Army is buying now.

Oil and Gas Pipeline and Related Structures Construction contracts right now

There are 4 open government contract opportunities in this trade (NAICS 237120), 1 posted in the last 7 days; 50% are set aside for small businesses. The agencies buying the most are Department of the Army.

All open oil and gas pipeline and related structures construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

South Timbalier 54/67 & Grand Isle 22 Well
Department of the Interior
Award FY 2026 · $10M - $19M · To Be Determined
Atwater 63 Pipeline Decommissioning
Department of the Interior
Award FY 2026 · $2M - $4.9M · To Be Determined
Matagorda Island Pipeline Decommissioning
Department of the Interior
Award FY 2026 · $2M - $4.9M · To Be Determined

Similar open oil and gas pipeline and related structures construction bids

Kingsley Field Fueling System Repairs
Department of the Army
Due Oct 29, 2026, 2:00 PM (UTC-6) · 9 days left
Sources Sought · Posted Oct 8, 2026
Joint Base Langley Eustis Tank Repairs
Department of the Army
Due Oct 20, 2026, 2:00 PM (UTC-5) · due today
Solicitation · Small business · Posted Oct 7, 2026
FY 26 Roush Lake Diesel Fill Tube Replacement
Department of the Army
Solicitation · Small business · Posted Oct 1, 2026