Home / Navy / Other Communications Equipment Manufacturing / Notice

Panel, Control, Elect

Updated

Solicitation from the Department of the Navy. Due Nov 10, 2026, 4:30 PM (UTC-4), 20 days left.

Be among the first to see new Other Communications Equipment Manufacturing contracts
Only new notices that match, once a day.
Title as postedPANEL,CONTROL,ELECT
Solicitation numberN0010427QUA16
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Communications Equipment Manufacturing (334290)
Product or service code7G20
PostedOct 20, 2026
Response deadlineNov 10, 2026, 4:30 PM (UTC-4) (20 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email protected]. B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting. C. This RFQ is for REPAIR.

The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. D. Only a firm-fixed (FFP), not-to-exceed (NTE) or estimated (EST) price for the REPAIR of the subject item(s) willbe accepted.

Quotes limited to test and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the REPAIR of the item(s). E. Must adhere to IUID requirements of DFARS 252.211-7003 F. The ultimate awardee of the proposed contract action must be an authorized repair source.

Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. G. The Government is requesting a Repair Turnaround Time (RTAT) of: 202 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s).

Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of '0' (zero) per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date.

Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. H. IMPORTANT NOTE: Reconciliation Price Reduction: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction.

If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ?Reconciliation Modification? at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default.

In reference to the above important note, the contractor provides the following price reduction amount per unit/per month the contractor does not meet the RTAT: $__________, up to a maximum of: $__________. (vendor is to fill in amount) I. Your quote MUST include the following information for justification purposes: - Repair unit price __________ - Total price__________ - Repair Turnaround Time (RTAT) __________ days - New unit price __________ NOTE: If you are not quoting the Government's Requested Repair Turnaround Time (RTAT) or sooner, you must provide your company's capacity constraints below: __________ __________ __________ - T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR/BER, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $__________associated with the repair effort to reflect the BR status of the equipment. - The T&E fee (if asset is determined BR/BER) was determined based on: __________ __________ - Award to CAGE:________ - Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________ - Facility/Subcontractor CAGE (where the

Contact: N711.16 · CJ8 · 771-229-0600 · [email protected]

Clauses in this notice (11):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 334290, a business counts as small if it has no more than 800 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for other communications equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Communications Equipment Manufacturing contracts right now

There are 69 open government contract opportunities in this trade (NAICS 334290), 21 posted in the last 7 days; 20% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Army. Most of the work with a stated place is in Pennsylvania, Maryland and Alabama. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 21 days.

All open other communications equipment manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

IMT FMS Fire Alarm System Replacement (LCB)
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · Below $150K · To Be Determined
GC Replace Existing 125VDC Distribution
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · $1M - $1.9M · Small Business · Firm Fixed Price
Replace Phone and nternet Service with Starlink
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · To Be Determined

Recent awards in this trade

From the award notices agencies publish.

Similar open other communications equipment manufacturing bids

Case, Electronic Commun
Defense Logistics Agency
Due Oct 28, 2026 · 7 days left
Solicitation · Posted Oct 20, 2026
Module Assembly, UHF
Defense Logistics Agency
Due Nov 16, 2026, 4:30 PM (UTC-4) · 26 days left
Solicitation · Posted Oct 20, 2026
Detector
Defense Logistics Agency
Due Oct 22, 2026, 3:00 PM (UTC-4) · 1 day left
Sources Sought · Posted Oct 20, 2026
N0038326PR0R831 FMS
Department of the Navy
Due Nov 19, 2026 · 29 days left
Solicitation · Posted Oct 20, 2026
Panel, Sonar GTC
Department of the Navy
Due Nov 9, 2026, 4:30 PM (UTC-5) · 19 days left
Solicitation · Posted Oct 20, 2026
Control, Converter
Defense Logistics Agency
Due Nov 5, 2026, 12:00 AM (UTC-5) · 15 days left
Solicitation · Posted Oct 20, 2026