Home / Air Force / Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing / Notice

PIGA Float Assembly Repair Program

Updated

Solicitation from the Department of the Air Force, for work in Hill AFB, Utah. Due Dec 3, 2026, 12:00 PM (UTC-7), 45 days left.

Get new Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing contracts in your inbox every morning
Only new notices that match, once a day. Stop with one click.
Solicitation numberFA821426RB002
AgencyDepartment of the Air Force
OfficeFA8214 Afnwc Pzbb
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing (334511)
Product or service codeJ014
Place of performanceHill AFB, Utah
PostedOct 5, 2026
Response deadlineDec 3, 2026, 12:00 PM (UTC-7) (45 days left)

Official notice and attachments

Description

Login at piee.eb.mil and search for 'FA821426RB002' to obtain more details.* Documents related to this procurment are only available through PIEE. 1. Executive Summary: Background & Objective The U.S. Air Force has a critical requirement to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) by maintaining the operational readiness of the Missile Guidance Set (MGS) to meet warfighter requirements.

Specifically, this effort supports the repair line for the Pendulous Integrated Gyroscopic Accelerometer (PIGA) Float Assembly. The PIGA Float is a critical and precise sub-assembly that serves as the heart of the PIGA instrument, enabling it to measure missile acceleration. Each MGS contains three separate PIGA instruments (each housing a PIGA Float).

Without this critical component, the ICBM would cease to function properly. The PIGA Float repair effort is a continuous operation necessary to avoid mission degradation. Quality control and precision engineering are paramount due to the strategic importance of the MMIII weapon system.

The contractor must maintain stringent quality assurance protocols to guarantee that each repaired PIGA Float meets the rigorous military specifications. 2. Scope of Work The contractor shall provide the necessary personnel, facilities, and expertise to support the PIGA Float Assembly repair line.

The primary scope includes: Repair Operations - The re-manufacture, rebuild, and repair of PIGA Float Assemblies. Volume / Throughput - The repair of 96 PIGA Floats per year. Government Furnished Equipment (GFE) - The repair and/or replacement of GFE as required to support continuous operation of the PIGA Float repair line 3.

Contract Structure & Period of Performance The Government anticipates awarding an Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing a mix of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP) pricing arrangements. Contract Duration - 5-Year IDIQ Anticipated Ordering Period - 1 November 2026 – 31 October 2031 Task Order Structure - Annual issuance of new, two-year non-severable Task Orders 4.

Acquisition Authority & Strategy In accordance with Revolutionary FAR Overhaul (RFO) Subpart 5.1, this solicitation is an intended sole-source procurement. The Government will solicit and negotiate with only one source: Honeywell Aerospace (CAGE: 09128). This action is taken under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1.

Market research—including Sources Sought Synopsis FA821425CBPIGA (posted 29 May 2025)—concluded that Honeywell Aerospace is the only responsible source capable of fulfilling the Government’s requirement without causing unacceptable delays to the MMIII weapon system mission. Note: While this is not a request for competitive proposals, information received from other responsible sources identifying their interest and capability will be considered solely to determine whether to conduct a competitive procurement in the future, at the Government’s discretion.

5. Proposal Submission Instructions All proposals submitted in response to this solicitation must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No other methods of proposal submission (e.g., email, hard copy, DoD SAFE) will be accepted.

Offerors must be registered in PIEE and have the appropriate roles activated to submit proposals via the Solicitation module prior to the proposal due date. Cost & Pricing Data: The Government requests that ProPricer models (version v9.5.105.2) be submitted in conjunction with all Certified Cost and Pricing Data. Mandatory Pricing Rubric: Submission of the attached Pricing Rubric is a mandatory requirement.

Proposals submitted without a completed Pricing Rubric will be automatically rejected by the PIEE solicitation module and will not be considered for evaluation. Submission Cutoff: Proposals will not be accepted after the solicitation closes. Timely submission is the sole responsibility of the offeror, and late proposals will not be evaluated unless otherwise stated under RFO guidelines.

About the buyer

The Department of the Air Force awarded $83.0 billion in contracts in the last 12 months; its biggest suppliers were The Boeing Company, The Boeing Company and Raytheon Company. See what Air Force is buying now.

Similar open search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing bids

RFI - UMTE X Band Transmitter
Department of the Air Force
Due Oct 21, 2026, 5:00 PM (UTC-6) · 2 days left
Sources Sought · Hill Air Force Base, UT · Posted Oct 1, 2026
Sensing Element, Fire D
Defense Logistics Agency
Due Oct 26, 2026 · 7 days left
Solicitation · Small business · Posted Oct 18, 2026
Multi Year Modernized Radios for Navigation/Communication (NAV/COMMs) Production Follow -On
Department of the Navy
Due Oct 31, 2026, 5:00 PM (UTC-4) · 12 days left
Presolicitation · San Diego, CA · Posted Oct 16, 2026
AN/ALE-47 Common Carriage Production IDIQ
Department of the Navy
Due Oct 30, 2026, 1:00 PM (UTC-4) · 11 days left
Sources Sought · Austin, TX · Posted Oct 16, 2026
Cover, Protective, to
Department of the Navy
Due Nov 9, 2026, 4:30 PM (UTC-5) · 21 days left
Solicitation · Posted Oct 16, 2026
Elevator Feel, Airc
Defense Logistics Agency
Due Oct 26, 2026, 4:30 PM (UTC-4) · 7 days left
Solicitation · Posted Oct 15, 2026