Regulator, Air Press
Updated
Solicitation from the Department of the Navy. Due Nov 20, 2026, 4:30 PM (UTC-4), 30 days left.
| Title as posted | REGULATOR,AIR PRESS |
|---|---|
| Solicitation number | N0038325QD135 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413) |
| Product or service code | 1660 |
| Posted | Oct 20, 2026 |
| Response deadline | Nov 20, 2026, 4:30 PM (UTC-4) (30 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Official notice and attachments
Description
The purpose of this amendment is to increase the quantity from 6 units to 7 units. The purpose of this amendment is to extend the solicitation close date. The purpose of this amendment is to extend the solicitation closing date.
Please submit quote via email to [email protected] by the due datespecified on page 1, block 10. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset acceptance under the terms of the contract. Forpurposes of this section, Return is defined as physical receipt of theF-condition asset at the contractor's facility as reflected in the Action Dateentry in the Commercial Asset Visibility (CAV) system.
In accordance with theCAV Statement of Work, the contractor is required to accurately report alltransactions by the end of the fifth regular business day after receipt andthe Action Date entered in CAV must be dated to reflect the actual date ofphysical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract.
Required RTAT: 183 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint foreach NSN(s). Total assets to be repaired monthly after initial deliverycommences X/month (contractor fill in #).
A throughput of ##____ per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:A reconciliation modification will be issued after final inspection andacceptance of all assets inducted under the subsequent contract. The partieshave agreed to a price (shown on the schedule page) for each unit at thenegotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page.
If the Contractor does notmeet the applicable RTAT requirement, consideration will be assessed andsubject to negotiation. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email.
The Government's acceptance of the CONTRACTOR'SPROPOSAL constitutes bilateral agreement to "issue" contractual documents asdetailed herein. Early and incremental deliveries accepted and preferred. This RFQ is for repair.
This RFQ is in accordance with FAR part 15. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.
The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement.
SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2.
Applicable documents - not applicable 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition.
3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL:
Contact: N721.27 · N00383 · 2156973473 · [email protected]
Clauses in this notice (14):
- Item Unique Identification and Valuation (Jan 2023)
- Higher-Level Contract Quality Requirement
- Inspection and Acceptance of Supplies
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Warranty of Supplies of a Noncomplex Nature (Jun 2003)
- Equal Opportuity for Workers with Disabilities (Jun 2020)
- Buy American-Free Trade Agreements-Balance of Payments Program-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Oct 2024)
- Buy American-Free Trade Agreements-Balance of Payments Program Certificate-Basic (Feb 2024))
- Buy American--Balance of Payments Program (Feb 2024)
- Royalty Information (Apr 1984)
- Annual Representations and Certifications (Mar 2025)(DEVIATION 2025-O0003 and 2025-O0004))
- Notice of Priority Rating for National Defense, Emergency Preparedness, Andenergy Program Use (Apr 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 336413, a business counts as small if it has no more than 1,250 employees (SBA size standard, with exceptions in the notes). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 20, 2026: Solicitation Due Nov 20, 2026, 4:30 PM (UTC-4)
- Feb 27, 2026: Solicitation Due Mar 30, 2026, 4:30 PM (UTC-4)
- Feb 27, 2026: Solicitation Due Mar 30, 2026, 4:30 PM (UTC-4)
- Jul 10, 2025: Solicitation Due Aug 25, 2025, 4:30 PM (UTC-4)
- Jun 12, 2025: Solicitation Due Jul 14, 2025, 4:30 PM (UTC-4)
Companies that win this kind of work
Federal contractors paid for other aircraft parts and auxiliary equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Northrop Grumman Systems Corporation $1.6 billion in this trade
- RTX Corporation $1.1 billion in this trade
- L3HARRIS Technologies Integrated Systems L.P. $953.7 million in this trade
- Lockheed Martin Corporation $857.7 million in this trade
- Bell Boeing Joint Project Office $852.8 million in this trade
About the buyer
The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts right now
There are 646 open government contract opportunities in this trade (NAICS 336413), 259 posted in the last 7 days; 31% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Air Force. Most of the work with a stated place is in Virginia, Oklahoma and Pennsylvania. A notice in this trade gives a median of 29 days from posting to deadline; this one gives 31 days.
All open other aircraft parts and auxiliary equipment manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Ontic Engineering & Manufacturing, Inc $247,040 · Defense Logistics Agency · Oct 20, 2026
- Ontic Engineering & Manufacturing, Inc $60,263 · Defense Logistics Agency · Oct 20, 2026
- Transaero, Inc. $926,616 · Defense Logistics Agency · Oct 20, 2026
- Federal Industries, Inc. $730,770 · Defense Logistics Agency · Oct 20, 2026
- Sequoia Defense LLC $123,292 · Defense Logistics Agency · Oct 20, 2026
From the award notices agencies publish.