Home / Navy / Motor Vehicle Gasoline Engine and Engine Parts Manufacturing / Notice

Actuator, Electromec, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Oct 28, 2026, 4:30 PM (UTC-4), 4 days left.

Be among the first to see new Motor Vehicle Gasoline Engine and Engine Parts Manufacturing contracts
Only new notices that match, once a day.
Title as posted29--ACTUATOR,ELECTROMEC, IN REPAIR/MODIFICATION OF
Solicitation numberN0038327QNA07
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Motor Vehicle Gasoline Engine and Engine Parts Manufacturing (336310)
Product or service code2910
PostedOct 23, 2026
Response deadlineOct 28, 2026, 4:30 PM (UTC-4) (4 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

Terms & Conditions of BOA/LTC N0038322GZ901 apply. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1.

SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: ACTUATOR,ELECTROMEC ;2910016969261; NSN , ;826615-5 (73030); Part Number, Shall be performed IAW: ACTUATOR,ELECTROMEC ;Latest Rev.; Publication (s).

1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. Applicable documents - not applicable 3.

REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. Responsibility for inspection: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein.

PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. Quality assurance program plan: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured.

All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source.

The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). Receiving inspection of purchased material: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item.

Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government.

NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition.

A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer.

Responsibility for compliance: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements.

Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program.

A quantity of CLIN's may be rand

Contact: N731.47 · n00383 · 771-229-0615 · [email protected]

Clauses in this notice (1):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 336310, a business counts as small if it has no more than 1,050 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for motor vehicle gasoline engine and engine parts manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Motor Vehicle Gasoline Engine and Engine Parts Manufacturing contracts right now

There are 30 open government contract opportunities in this trade (NAICS 336310), 8 posted in the last 7 days; 53% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency and Department of the Navy. A notice in this trade gives a median of 13 days from posting to deadline; this one gives 5 days.

All open motor vehicle gasoline engine and engine parts manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

G19-G21 TGB Oil Cooler
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
LAKE - 14110 - Replace Aged Munson Watercraft for the Maintenance Division
National Park Service
Award FY 2027 · $250K - $499K · To Be Determined

Recent awards in this trade

From the award notices agencies publish.

Similar open motor vehicle gasoline engine and engine parts manufacturing bids

O Ring
Defense Logistics Agency
Due Oct 30, 2026, 11:59 PM (UTC-4) · 6 days left
Sources Sought · Posted Oct 23, 2026
Manifold, Valve
Defense Logistics Agency
Due Nov 2, 2026 · 9 days left
Solicitation · Posted Oct 22, 2026
Cover and Solenoid Ass
Defense Logistics Agency
Due Nov 2, 2026 · 9 days left
Solicitation · Small business · Posted Oct 22, 2026
Plunger, Actuator
Defense Logistics Agency
Due Nov 2, 2026 · 9 days left
Solicitation · Posted Oct 20, 2026
Valve, Positive Crankca
Defense Logistics Agency
Due Oct 30, 2026 · 6 days left
Solicitation · Small business · Posted Oct 19, 2026
Nozzle, Fuel Injecti
Defense Logistics Agency
Due Oct 29, 2026 · 5 days left
Solicitation · Small business · Posted Oct 18, 2026