High Stage Precoole, in Repair/Modification of
Updated
Solicitation from the Department of the Navy. Due Nov 23, 2026, 4:30 PM (UTC-4), 30 days left.
| Title as posted | 48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0038327QSA04 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Metal Valve and Pipe Fitting Manufacturing (332919) |
| Product or service code | 4820 |
| Posted | Oct 23, 2026 |
| Response deadline | Nov 23, 2026, 4:30 PM (UTC-4) (30 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Official notice and attachments
Description
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.
In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: 77 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract.
The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicableRTAT requirement, consideration will be assessed and subject to negotiation.
All contractual documents (i.e. contracts, purchase orders, task ordersdelivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 .
Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.
The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement.
SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2.
Applicable documents - not applicable 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition.
3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul m
Contact: N763.05 · P5F · 771-229-0468 · [email protected]
Clauses in this notice (15):
- Item Unique Identification and Valuation (Jan 2023)
- Higher-Level Contract Quality Requirement
- Wide Area Workflow Payment Instructions (Jan 2023)
- Monetary Limitation Repair Purchase Orders
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Warranty of Supplies of a Noncomplex Nature (Jun 2003)
- Equal Opportuity for Workers with Disabilities (DEV 2026-O0040)(Feb 2026)
- Buy American-Free Trade Agreements-Balance of Payments Program-Basic (Feb 2024)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- Buy American-Free Trade Agreements-Balance of Payments Program Certificate-Basic (Feb 2024))
- Buy American--Balance of Payments Program Certificate-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Royalty Information (Apr 1984)
- Notice of Priority Rating for National Defense, Emergency Preparedness, Andenergy Program Use (Apr 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 7, 2026: Presolicitation Due Nov 23, 2026, 12:00 AM (UTC-4)
Companies that win this kind of work
Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Bell Boeing Joint Project Office $9.7 million in this trade
- Ruta Supplies Inc $5.0 million in this trade
- JA Moody LLC $4.4 million in this trade
- Leslie Controls, Inc. $3.4 million in this trade
- Hamilton Sundstrand Corporation $1.7 million in this trade
About the buyer
The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Metal Valve and Pipe Fitting Manufacturing contracts right now
There are 185 open government contract opportunities in this trade (NAICS 332919), 86 posted in the last 7 days; 5% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and Department of Veterans Affairs. Most of the work with a stated place is in Maine, California and Massachusetts. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 31 days.
All open other metal valve and pipe fitting manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Martin Military Inc $51,908 · Defense Logistics Agency · Oct 23, 2026
- Circor Naval Solutions LLC $66,873 · Defense Logistics Agency · Oct 22, 2026
- Echelon Supply And Service, Inc. $59,535 · Defense Logistics Agency · Oct 21, 2026
- Seal Dynamics LLC $28,000 · Defense Logistics Agency · Oct 20, 2026
- Hydro-Fitting Manufacturing Corporation $28,843 · Defense Logistics Agency · Oct 19, 2026
From the award notices agencies publish.