Valve, Regulating, FL, in Repair/Modification of
Updated
Solicitation from the Department of the Navy. Due Nov 20, 2026, 4:30 PM (UTC-4), 28 days left.
| Title as posted | 48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0010425QZB97 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Metal Valve and Pipe Fitting Manufacturing (332919) |
| Product or service code | 4820 |
| Posted | Oct 22, 2026 |
| Response deadline | Nov 20, 2026, 4:30 PM (UTC-4) (28 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Official notice and attachments
Description
This amendment shall be issued to incorporate Local Text WSSTERMHZ22, update the TDP from version 005 to version 006, and extend the closing date of the subject solicitation. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 20 November 2026. \ National Defense, Emergency Preparedness, and Energy Program Use. sk orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either in the mail, transmitted by facsimile, or sent by other electronic methods, such as email.
The Government's acceptance of the contract proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. The following proposed delivery schedule applies: Final delivery of material shall be on or before 525 days after the effective date of the contract.
3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See FAR Clause 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use.
4. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 5.
All transportation to/from the repair site will be paid for by the US Navy. 6. Offers shall be submitted as an estimated price for the full repair effort based on the repair instruction or SOW.
The contractor shall have 30 days to complete a teardown and evaluation of the carcasses and submit a repair report and Firm-Fixed Price offer. A cost of new price shall also be provided in addition to the repair price. 7.
Include in the estimated price all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Please include the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: 8. This requirement utilizes Government Furnished Property (GFP).
Any GFP located at the contractor's facility in storage that can be used for repair of the requirement must be utilized and called out within the final quote. 9. The contractor shall comply with the Commercial Asset Visibility (CAV) of the asset(s) in this order in accordance with NAVSUPWSSFA24. 10.
Repair Turn Around Time (RTAT) - the resultant contractual delivery requirement is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract. Requested RTAT: XXX Days Proposals shall reference the proposed RTAT and any capacity constraints. Price Reductions Any assets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit.
This adjustment will be implemented via a reconciliation modification at the end of contract performance. Price reductionsmade pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. Reconciliation A reconciliation modification will be issued after final inspection and acceptance of all assets inducted under this contract.
The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall be applicable. \
- SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the VALVE,REGULATING,FL .
- APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence.
Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Specification Revisions - The specification revisions listed under "Do
Contact: N742.10 · WV1BB · N/A · [email protected]
Clauses in this notice (11):
- Item Unique Identification and Valuation (Jan 2023)
- Inspection of Supplies--Fixed-Price (Aug 1996)
- Inspection/Acceptance Point
- Wide Area Workflow Payment Instructions (Jan 2023)
- Monetary Limitation Repair Purchase Orders
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Warranty of Supplies of a Noncomplex Nature (June 2003)
- Alternate A, Annual Representations and Certifications (Oct 2024)
- Buy American-Balance of Payments Program Certificate-Basic (Feb 2024)
- Annual Representations and Certifications (Mar 2025)(DEVIATION 2025-O0003 AND2025-O0004))
- Notice of Priority Rating for National Defense, Emergency Perpardeness, and ENRGY Progam Use (April 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 22, 2026: Presolicitation Due Nov 20, 2026, 4:30 PM (UTC-4)
- Oct 22, 2026: Solicitation Due Nov 20, 2026, 4:30 PM (UTC-4)
- May 22, 2025: Solicitation Due Jun 23, 2025, 4:30 PM (UTC-4)
- May 21, 2025: Presolicitation Due Jun 23, 2025, 12:00 AM (UTC-4)
Companies that win this kind of work
Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Bell Boeing Joint Project Office $9.7 million in this trade
- Ruta Supplies Inc $5.0 million in this trade
- JA Moody LLC $4.4 million in this trade
- Leslie Controls, Inc. $3.4 million in this trade
- Hamilton Sundstrand Corporation $1.7 million in this trade
About the buyer
The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Metal Valve and Pipe Fitting Manufacturing contracts right now
There are 201 open government contract opportunities in this trade (NAICS 332919), 100 posted in the last 7 days; 8% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and Department of Veterans Affairs. Most of the work with a stated place is in Hawaii, Maine and California. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 29 days.
All open other metal valve and pipe fitting manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Circor Naval Solutions LLC $66,873 · Defense Logistics Agency · Oct 22, 2026
- Echelon Supply And Service, Inc. $59,535 · Defense Logistics Agency · Oct 21, 2026
- Seal Dynamics LLC $28,000 · Defense Logistics Agency · Oct 20, 2026
- Hydro-Fitting Manufacturing Corporation $28,843 · Defense Logistics Agency · Oct 19, 2026
- Aerospace Control Products, Inc. $66,000 · Defense Logistics Agency · Oct 19, 2026
From the award notices agencies publish.