Home / Navy / Motor and Generator Manufacturing / Notice

Control, Generator, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Oct 27, 2026, 4:30 PM (UTC-4), 4 days left.

Be among the first to see new Motor and Generator Manufacturing contracts
Only new notices that match, once a day.
Title as posted61--CONTROL,GENERATOR, IN REPAIR/MODIFICATION OF
Solicitation numberN0038327QNA03
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Motor and Generator Manufacturing (335312)
Product or service code6110
PostedOct 22, 2026
Response deadlineOct 27, 2026, 4:30 PM (UTC-4) (4 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

Terms & Conditions of BOA/LTC N0038322GZW01 apply. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1.

SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;HAMILTON SUNDSTRAND CORP; drawing number ( ;73030; ) ;1709959; , Revision ;Latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CONTROL,GENERATOR ;1709959; P/N, ;7RH 6110 015854820 P8; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.

Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract.

Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.

If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technica

Contact: N731.47 · N00383 · 771-229-0615 · [email protected]

Clauses in this notice (1):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 335312, a business counts as small if it has no more than 1,250 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for motor and generator manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Motor and Generator Manufacturing contracts right now

There are 95 open government contract opportunities in this trade (NAICS 335312), 35 posted in the last 7 days; 28% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Army. Most of the work with a stated place is in California, Texas and North Carolina. A notice in this trade gives a median of 14 days from posting to deadline; this one gives 5 days.

All open motor and generator manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SEL 300 PROT Gen
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
NEW - Supply and install emergency back-up generator at UFO for SCADA/Exchange operations
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
GC-Emergency Power K3E - 4160V
Department of the Interior
Acquisition Planning · Award FY 2026 · $2M - $4.9M · Small Business · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open motor and generator manufacturing bids

Motor, Alternating C
Defense Logistics Agency
Due Nov 2, 2026 · 10 days left
Solicitation · Small business · Posted Oct 22, 2026
Motor, Alternating C
Defense Logistics Agency
Due Nov 9, 2026, 4:30 PM (UTC-4) · 17 days left
Solicitation · Posted Oct 22, 2026
Brake, Electric
Defense Logistics Agency
Due Nov 2, 2026, 2:00 PM (UTC-4) · 10 days left
Solicitation · Posted Oct 22, 2026
Motor, Alt Current
Defense Logistics Agency
Due Nov 5, 2026, 4:30 PM (UTC-4) · 13 days left
Solicitation · Posted Oct 22, 2026
Cont, Multi-Loop Pro
Defense Logistics Agency
Due Nov 12, 2026, 4:30 PM (UTC-4) · 20 days left
Solicitation · Posted Oct 22, 2026
Motor, Alternating CURR
Defense Logistics Agency
Due Nov 2, 2026 · 10 days left
Solicitation · Small business · Posted Oct 22, 2026