Home / Navy / Motor and Generator Manufacturing / Notice

Controller, Electric, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Nov 23, 2026, 4:30 PM (UTC-4), 30 days left.

Be among the first to see new Motor and Generator Manufacturing contracts
Only new notices that match, once a day.
Title as posted61--CONTROLLER,ELECTRIC, IN REPAIR/MODIFICATION OF
Solicitation numberN0038327QPA04
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Motor and Generator Manufacturing (335312)
Product or service code6110
PostedOct 23, 2026
Response deadlineNov 23, 2026, 4:30 PM (UTC-4) (30 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)

Official notice and attachments

Description

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: #550 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #).

A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page.

If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e. contracts, purchase orders, task ordersdelivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.

The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 .

Markings shall be in accordance with MIL-STD-130. 1.2 PRE-award / post award requirements: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.

1.3.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CONTROLLER,ELECTRIC ;6110-01-703-0671; NSN , ;2056AS4000-G05; Part Number, Shall be performed IAW: Controller,electric ;repair/overhaul/inspect IAW applicable repair manuals, technical specifications, engineering orders and drawings. LATEST DRAWING.; Publication (s).

1.3.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II.

1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent.

1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft.

The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures ar

Contact: N762.44 · P2C · (771)229-0524 · [email protected]

Clauses in this notice (14):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 335312, a business counts as small if it has no more than 1,250 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for motor and generator manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.6 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Motor and Generator Manufacturing contracts right now

There are 81 open government contract opportunities in this trade (NAICS 335312), 38 posted in the last 7 days; 27% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Army. Most of the work with a stated place is in California and Texas. A notice in this trade gives a median of 15 days from posting to deadline; this one gives 31 days.

All open motor and generator manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SEL 300 PROT Gen
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
NEW - Supply and install emergency back-up generator at UFO for SCADA/Exchange operations
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
GC-Emergency Power K3E - 4160V
Department of the Interior
Acquisition Planning · Award FY 2026 · $2M - $4.9M · Small Business · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open motor and generator manufacturing bids

Generator, Alternati, in Repair/Modification of
Department of the Navy
Due Nov 23, 2026, 2:00 PM (UTC-4) · 30 days left
Solicitation · Posted Oct 23, 2026
Panel, Power Distrib, in Repair/Modification of
Department of the Navy
Due Oct 26, 2026, 4:30 PM (UTC-4) · 2 days left
Solicitation · Posted Oct 23, 2026
Motor, Alternating CURR
Defense Logistics Agency
Due Nov 7, 2026 · 14 days left
Solicitation · Posted Oct 23, 2026
Motor, Alternating C
Defense Logistics Agency
Due Nov 2, 2026 · 9 days left
Solicitation · Small business · Posted Oct 22, 2026
Motor, Alternating C
Defense Logistics Agency
Due Nov 9, 2026, 4:30 PM (UTC-4) · 16 days left
Solicitation · Posted Oct 22, 2026
Brake, Electric
Defense Logistics Agency
Due Nov 2, 2026, 2:00 PM (UTC-4) · 9 days left
Solicitation · Posted Oct 22, 2026