Home / Septic Toilet Pumping for Chippewa National Forest / Document

Attachment A Schedule of Items

Updated

A PDF document (205 KB) attached to Septic Toilet Pumping for Chippewa National Forest, from the Forest Service. Due Nov 4, 2026, 5:00 PM (UTC-5).

File name: Attachment A Schedule of Items.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Schedule of Items
Tank and Vault Toilet Pumping
Chippewa National Forest

SCHEDULE OF ITEMS

Tanks to be pumped annually, except where noted with an asterisk. * Work to be completed between the day after Labor Day and October 31

BASE

OPTION OPTION

Amount YR -1
YR -2
Location
2027
Amount Amount
2028
2029
Marcell Area
Clubhouse Campground four double
vaults
Clubhouse Campground host holding
tank
North Star Campground two double
vaults
North Star Campground host holding tank
(1000 gallons)
* Laurentian Divide Access one single
vault
North Suomi Parking Lot one single vault
South Suomi parking Lot one single vault
South Trout Lake trailhead one single
vault
* Joyce Estate, one single vault (access
limited, need smaller truck)
* Spider Lake Access single vault
Additional pumping single vault
Additional pumping double vault
Cut Foot Sioux Area
East Seelye Campground two double
vaults
West Seelye Campground two double
vaults
North Deer Lake Campground two
double vaults
South Deer Lake Campground three
double vaults
Mosomo Point Campground two double
vaults

OPTION

YR -3
Amount
2030

OPTION

YR -4
Amount
2031

Mosomo Point Boat Access one double
vault
Onegume Campground four double vaults
Williams Narrows Campground
two double vaults
Cutfooot Horse Campground
three single vaults
Middle Pigeon Boat Ramp & Dispersed
site, one double vault
Plughat Access one single vault
Cutfoot Fishing Pier one single vault
* N. Bowstring Lake Access one single
vault
Additional pumping single vault
Additional pumping double vault
Blackduck Area
Lost 40 trailhead one single vault
* Noma Lake Camping Area one single
vault
* Dora Lake Access one single vault
Bimijiwan (Knutson Dam) Campground
one double vault
West Winnie Campground one double
vault
* Winnie Campground host holding tank
Third River Landing one single vault
Richards Townsite one single vault
Webster Lake Campground one double
vault
Gilstad Boat Access one single vault
Benjamin Beach one double vault
Rabideau CCC one double vault
Rabideau CCC Host Site one holding
tank
Rabideau CCC shower vaults (2 1500
gallon tanks)
Additional pumping single vault
Additional pumping double vault
Norway Beach Recreation Area
5 double vaults, one in each loop and day
use area
5 septic tanks, 4 @ 4,200 and 1 @ 5,600

The beginning of the document. Download the full file to read on.

Other documents in this bid