INDUSTRY DAY NOTIFICATION
(9:00AM CDT – October 28, 2026 – Mobile, AL)
Selma, Alabama Flood Risk Management and Bank Stabilization Project Synopsis
The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day to discuss the design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88. The NAICS Code for this project will be 237990 Other Heavy and Civil Engineering Construction. The project is anticipated to be advertised as a Design-Build-to-Budget procurement. The magnitude of construction for this project is estimated to be between $30 - $40M.
Event Details
The event is scheduled from 9:00 to 11:00 a.m. CDT on Thursday, October 28, 2026, at the Mobile District Office, 100 Canal St., Mobile, AL 36602. The event will include a general session with a 45-minute presentation on the project overview, status, and schedule, followed by an open discussion/feedback period. The event will also be hosted virtually via Microsoft TEAMS with a meeting invitation sent the week of October 23rd, 2026, to those confirmed attendees.
At the contractor's request, individual 30-minute break-out sessions will be held that afternoon. Contractor comments and suggestions are strongly encouraged. Soldier Pile Wall Design
A general description of the project can be found in the Selma, Alabama Flood Risk Management Study Integrated Feasibility Report and Environmental Assessment located at the following link:
Mobile District > Missions > Program and Project Management > Civil Projects > Selma, Alabama Flood Risk Management Feasibility Study > Primary Documents (army.mil)
The draft soldier pile wall design, along with recent Structural Assessment Reports of each property in the project area, are available at the following link:
https://www.sam.usace.army.mil/Missions/Program-and-Project-Management/CivilProjects/Selma-Alabama-Flood-Risk-Management-Feasibility-Study/Design Phase/
Please e-mail Mr. Jonas White at [email protected] by 5:00 PM CDT on October 23, 2026, if you plan to attend this event. Provide your name, contact