Home / 10-Miler Fencing / Document

Attachment 1: Performance Work Statement Fencing

Updated

A PDF document (147 KB) attached to 10-Miler Fencing, from the Department of the Air Force. Due Oct 28, 2026, 2:30 PM (UTC-4).

File name: Attachment 1 - PWS Fencing.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

2026 Space Force T-Minus 10-Miler
Performance of Work Statement
Fencing
The Period of Performance (POP) for this contract will include a Base Year + the Government’s potential to add four (4) additional one year options. 1. Onsite point of contact will be MSgt Alexander Batiz (520) 331-3416 or Thom Doucette (937) 287-7956.
2.

Required materials
• Vendor will provide 4500 linear feet of Fence Panel hard barricades (size of panels should be approx. 4’ x 10’).
• Hard Barricades – 4500 ft of barricades meant for stopping/preventing vehicle access.

3.

Delivery and setup: Friday prior to Event.
Year
Set Up Date
Time

Tear Down Date

Time

2026

December 11

1000

December 12

0800-1500

2027

December 10

1000

December 11

0800-1500

2028

December 8

1000

December 9

0800-1500

2029

December 7

1000

December 8

0800-1500

2030

December 13

1000

December 14

0800-1500

•
•
•
•

Delivery of Fence Panels and hard barricades will begin no later than 1000 on set up date at Hangar C, 3845 Lighthouse Road, CCSFS, FL 32925. *Of note, it will take at least an hour to get through the Inspection Gate. Please plan accordingly. Contractor will stand up fence in its entirety and government will inspect upon completion. Ready for inspection no later than 1600 on setup day. All contractors must be off the installation by 1700 local time.
Maps will be provided with fence set up locations upon contract award. Maps are subject to change.
Contractor will begin setup with fencing in the parking area of Hangar C then proceed onto the course following maps provided. Fencing at hangar C and the adjacent roadway, Lighthouse Road, can be placed on Friday prior to the event, beginning at 1000 hours to allow for scrim attachment (scrim attachment to be accomplished by AFM staff and volunteers).

•
•

Delivery locations throughout the remaining course are to be placed on the road shoulders out of the flow of traffic at the respective course locations. The contractor is responsible for all fence and barricade setup. The government will be allowed to make final adjustments but is not responsible for setup or teardown of items.

4. Teardown: Saturday of Event, beginning immediately after the start of the event. • Contractor is to be in place and prepared by 0600 at the contractor staging area near the start line to begin teardown immediately following the start of the race once clear of runners. Actual teardown will begin at approximately 0800 following the participants starting the course.
• Removal of the fence panels from all course locations should be accomplished by 1200

The beginning of the document. Download the full file to read on.

Other documents in this bid