Home / Statement of work examples

Statement of Work Examples from Real Government Bids

Updated

767 statements of work (SOW), performance work statements (PWS) and statements of objectives (SOO) from open federal bids, by trade. Each one shows how an agency describes the work it is buying: the scope, the tasks, the deliverables, the standards, the place and the schedule.

SOW, PWS or SOO?

A statement of work says what the contractor must do and how. A performance work statement says what results the agency needs and how it will measure them, and leaves the how to you. A statement of objectives gives only the goals and asks you to write the PWS in your offer. Read a few examples in your trade before you write a proposal: you will see the wording agencies use, how they set the period of performance, and what they inspect.

Each example opens with the first part of the document. The full file comes with the paid plan or with the bid on its own. See also government RFP documents and RFP vs RFQ.

Commercial and Institutional Building Construction statements of work (71)

Statement of Work ATTACHMENT Specifications
612A4-27-020 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 00 - SPECIAL SECTIONS 00 01 10 00 01 15…
Statement of Work ATTACHMENT Reference Drawings
1 2 3 4 5 6 7 8 9 10 A A B B 209 DUD LEY BLV D C C 98 D D ARNOLD AVE ARNOLD AVE 949 PEACEKEEPER WAY E E PALM ST O'MALLEY AVE F F WATT AVE 0 100 50 200 Feet 1:1000 ARCHITECT/ENGINEER OF RECORD…
Attachment - Construction Draft Statement of Work
Date: 10/07/2026 CONSTRUCTION STATEMENT OF WORK FOR Project Name: Replace Fire Suppression Systems BLDG 61 Project Number: 663A4-24-209 Place of Performance: American Lake Campus 9600 Veterans Drive…
Phasing Plan Statement of Work
Martinsburg VA Medical Center Phasing Plan Narrative Final Bid Documents EHRM Infrastructure Upgrades – Martinsburg, WV Contract #: 36C776220169 PO#: 613C20234 Project # 613-22-700 June 18, 2026…
Attachment 3: Statement of Work
For GAOA Facilities, Barracks Inyo NF · Forest Service
C. DESCRIPTION/ SPECIFICATIONS/ STATEMENT OF WORK C.1 Scope of Work Description of Work: The purpose of this contract is to obtain the services of a General Contractor to perform general maintenance…
Attachment 2: Statement of Work Rev1 Building 2 Substation Phase 1 642-22-104
CORPORAL MICHAEL J. CRESCENZ DEPARTMENT OF VETERAN AFFAIRS PHILADELPHIA, PA 19104 UPGRADE SUBSTATION BUILDING 2 PHASE 1 PROJECT NUMBER 642-22-104 Work Statement Corporal Michael J. Crescenz Medical…

65 more in commercial and institutional building construction contracts.

Research and Development in the Physical, Engineering, and Life Sciences statements of work (43)

TETHER - Statement of Work
Request for Information: N00173-27-RFI-EN01 Attachment No. 1 Page 1 Statement of Work (SOW) TIMED EMITTERS TRANSMITTING HIGHLY ENERGIZED RADIATION (TETHER) 23 OCT 2026 1. Introduction Request for…
Attachment 1: IDIQ Statement of Work
Statement of Work (SOW) Research, Development, Test & Evaluation (RDT&E) Support for The Naval Research Laboratory (NRL) Center for Corrosion Science and Engineering (CCSE) Introduction The Naval…
Attachment 3: Task Order 1 Statement of Work
RFP N00173-26-R-GF02Attachment No.: 01 – Task Order Statement of Work Supporting Readiness of WarFighting Platforms INTRODUCTION: The US Naval Research Laboratory (NRL) supports the existing and…
ATCH 1 CAML Lite Statement of Objectives
STATEMENT OF OBJECTIVES (SOO) Common Autonomous Multi-Domain Launcher (CAML)-Lite Prototype Effort Reference: Attachment 1 to Request for Solutions Brief (RFSB), 15 October 2026 Anticipated Request…
ATCH 1 CAML Lite Statement of Objectives Rev 1
STATEMENT OF OBJECTIVES (SOO) (Revision 1) Common Autonomous Multi-Domain Launcher (CAML)-Lite Prototype Effort Reference: Attachment 1 to Request for Solutions Brief (RFSB), 21 October 2026…
Attachment A - HBG2 Statement of Work v3.2
Attachment A Final RFP # 80GSFC27R0015 ATTACHMENT A STATEMENT OF WORK (SOW) HYDROSPHERE, BIOSPHERE, and GEOPHYSICS (HBG) SUPPORT SERVICES-II January 21, 2026 1 Attachment A Final RFP # 80GSFC27R0015…

37 more in research and development in the physical, engineering, and life sciences contracts.

Administrative Management and General Management Consulting Services statements of work (22)

Draft Performance Work Statement Support Services 1
For RFI-ePMO Support Services · Department of the Army
PERFORMANCE WORK STATEMENT (PWS) 1. Technical Point of Contact (TPOC). a. Contract Title: Defense Commissary Agency DeCA Enterprise Program Management Office (E-PMO) and Chief Technology Officer…
Performance Work Statement MF Premium Review Services
For Multifamily Premium Review Services · Department of Housing and Urban Development
Department of Housing and Urban Development Multifamily Insurance Operations Branch Performance Work Statement (PWS) Multifamily Premium Review Services October 13, 2026 1 September 2024 Vision…
Attachment 1: TOAST TO4 Performance Work Statement
Task Order 4 The following tasks and subtasks are included in the scope of work. The period of performance for this task is 24 months, with the expectation that the majority of work will be completed…
Attachment E-Sample Task Order Statement of Work
Contractor-Hosted Fully Integrated Records Facility (FIRF) IDIQ Recompete Request for Proposal (RFP) No. 75F40126R00009 Attachment E: Sample Task Order Statement of Work Title of Task Order: FDA/CDRH…
2026-10-07 Amendment 3 Attachment E-Sample Task Order Statement of Work
Contractor-Hosted Fully Integrated Records Facility (FIRF) IDIQ Recompete Request for Proposal (RFP) No. 75F40126R00009 Amendment 0003 Attachment E: Sample Task Order Statement of Work (revised…
OM AdQIC Statement of Work
Attachment J-1 – Statement of Work RFP 75FCMC26R0054 (AKA RFP 260025J) ADMINISTRATIVE QUALIFIED INDEPENDENT CONTRACTOR (AdQIC) TASK ORDER Attachment J-1 - STATEMENT OF WORK I. SCOPE The contractor…

16 more in administrative management and general management consulting services contracts.

Plumbing, Heating, and Air-Conditioning Contractors statements of work (21)

Statement of Work docx
For HVAC Unit Replacement · National Oceanic and Atmospheric Administration
STATEMENT OF WORK ​ Heating, Ventilation, and Air Conditioning (HVAC) Replacement 1.​ BACKGROUND: The current units have excited life expectancy and are operating unreliably. Each Next Generation…
Attachment 1: Performance Work Statement dated
For DCDO - HVAC Maintenance · Department of the Air Force
PERFORMANCE BASED WORK STATEMENT FOR Heating, Ventilation & Air Conditioning (HVAC) Systems SERVICES AT DEFENSE COMMUNICATIONS DETACHMENT (DCDO) Kadena Air Base, Japan (October 05, 2026) PWS Review…
Statement of Work
For Two sets of HVAC units or Mobile Ground Control Station · National Aeronautics and Space Administration
MGCS HVAC Requirements Deliverable: Two sets of HVAC units per the requirements below. Requirements: 1) Each set shall consist of two 5 Ton 3 phase 208 VAC Heat Pumps. 2) Input power for each HVAC…
Statement of Work HVAC bldg 2821
For HVAC Replacement, Bldg. 2821 · Department of the Air Force
STATEMENT OF WORK (SOW) Project Title: HVAC Split System Installation and Interior Restoration Facility / Location: Seymour Johnson Air Force Base, 1600 Wrights Brothers Ave., Goldsboro, NC 27531…
Statement of Work-BANDON
For Or-Bandon Marsh Nwr-Bandon HVAC · Departmental Offices
Statement of Work Bandon Marsh NWR Bunkhouse HVAC Replacement U.S. Fish and Wildlife Service 1. GENERAL This project is for the removal and replacement of the existing bunkhouse HVAC unit at Bandon…
Statement of Work-BANDON UPDATED 0001
For Or-Bandon Marsh Nwr-Bandon HVAC · Departmental Offices
USFWS, Bandon Marsh NWR, Bunkhouse HVAC system replacement Base Bid/Option 1 Bid Schedule 1 Removal of old system (heat pump and air handler) 2 Installation of new system (heat pump and air handler…

15 more in plumbing, heating, and air-conditioning contractors contracts.

Facilities Support Services statements of work (21)

Performance Work Statement Cambodia Angkor Sentinel BLS Facility Rehab Services
PERFORMANCE WORK STATEMENT (PWS) Angkor Sentinel 27 (AS27) Base Life Support and Facility Rehabilitation Services Part 1 General Information 1. General: This is a non-personal service(s) contract…
Attachment J-1. Performance Work Statement - FCDAS OM
PERFORMANCE WORK STATEMENT for OPERATIONS AND MAINTENANCE SERVICES of a FAIRBANKS COMMAND AND DATA ACQUISITION STATION TABLE OF CONTENTS SECTION 1.0 1.1 INTRODUCTION General Description SECTION 2.0…
Statement of Work - Fume Hoods
For Pharmacy/Alms Hood Certificaiton · Department of Veterans Affairs
STATEMENT OF WORK CONTRACT TITLE: Pharmacy and PALMS, Hood and BSC Certification PLACE OF PERFORMANCES: VA San Diego Healthcare System, 3350 La Jolla Village Dr., San Diego, CA 92161 PERIOD OF…
Seed Task Order Statement of Work Ark Lakes
TASK ORDER SCOPE OF WORK (SOW) FOR OPERATIONS & MAINTENANCE SERVICES (TP-1, TP-2, AND TP-4) 1.1 GENERAL STATEMENT OF WORK The purpose of this Task Order is to provide all necessary operations…
Amended Seed Task Order Statement of Work Ark Lakes
TASK ORDER SCOPE OF WORK (SOW) FOR OPERATIONS & MAINTENANCE SERVICES (TP-1, TP-2, AND TP-4) 1.1 GENERAL STATEMENT OF WORK The purpose of this Task Order is to provide all necessary operations…
Amendment 3: Seed Task Order Statement of Work Ark Lakes
TASK ORDER SCOPE OF WORK (SOW) FOR OPERATIONS & MAINTENANCE SERVICES (TP-1, TP-2, AND TP-4) 1.1 GENERAL STATEMENT OF WORK The purpose of this Task Order is to provide all necessary operations…

15 more in facilities support services contracts.

Engineering Services statements of work (19)

Statement of Work Title III GPNC Visitor Center 10 20
Title III Statement of Work Project GPNC-101 Construction Administration Services Great Plains Nature Center Renovation United States Fish and Wildlife Service Great Plains Nature Center, Wichita, KS…
Previous Performance Work Statement - NGATS Software Support
For NGATS Software Support · Department of the Army
Performance Work Statement (PWS) for Common Operator Test Environment (COTE) Support SCOPE To provide sustaining engineering and technical support services related to the system software…
Tab 04 Statement of Work
Procurement of CX-41 Flowserve MkII Control Valve 1.0 Background The gaseous nitrogen (GN2) meter station used by United Launch Alliance (ULA) at Space Launch Complex 41 is in need of an overhaul due…
Performance Work Statement - MARFORRES FDET Engineer Support Services
For Maven FSR · Department of the Navy
PERFORMANCE WORK STATEMENT (PWS) MARINE FORCES RESERVE FORWARD DEPLOYED ENGINEER & TRAINER (FDET) SUPPORT SERVICES 1.0 PURPOSE The purpose of this Performance Work Statement (PWS) is to obtain…
Atch 01 - CP Services Draft Performance Work Statement
Performance Work Statement (PWS) Project Title: CATHODIC PROTECTION SURVEY/INVENTORY/ASSESSMENT SERVICE CONTRACT (UFM 3-570-06, Chapter 3 Compliance) Location: [Insert DoW Installation / Base Name]…
Statement of Work
For 402-27-001 Repair Chiller 3 (AE) · Department of Veterans Affairs
VA Maine Healthcare System (Togus VAMC) 1 VA Center Augusta, ME 04330 6/18/2026 ARCHITECT-ENGINEER DESIGN SCOPE OF WORK Repair Chiller 3 PROJECT NO: 402-27-001 PROJECT NAME: Repair Chiller 3 – Togus…

13 more in engineering services contracts.

Ship Building and Repairing statements of work (15)

STRATTON SMP1 FY27 Hatch Renew - Statement of Work - updated
For USCGC Stratton Hatch Renew · US Coast Guard
SOW for RWTH 01-21-1 Renew USCGC STRATTON (WMSL-752) 1. This solicitation is to renew Raised Watertight Hatch 01-21-1 ON STRATTON The Contractor shall provide all necessary labor, supervision, tools…
Statement of Work - Gondola Detailed Design and Construction REV1
For Sonar Gondola Detailed Design and Fabrication · National Oceanic and Atmospheric Administration
NOAA SHIP NANCY FOSTER (R-352) 30JUL2026 MED/KRZ SONAR GONDOLA DETAILED DESIGN AND FABRICATION REQUIREMENTS 1.0 ABSTRACT 1.1 This specification describes requirements for detailed design of a sonar…
CGC Healy DS FY27 - SSA Comp. Lobe - Statement of Work (003)
For USCGC Healy Compressor lobes · US Coast Guard
PR #: 52000PR270000076 STATEMENT OF WORK STATEMENT OF WORK (SOW) FOR CGC Healy DS FY27 SSA Compressors 1.0 SCOPE This contract specifically addresses supply and delivery of three compressor lobes for…
Statement of Work Redacted
For Diesel Injection Pumps · Department of the Navy
Fuel Pump Refurbishments (16) ea. Statement of Work (SOW) 1. BACKGROUND: The Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) in support of requires OEM to complete…
Statement of Work USCGC RELIANCE REVERSE OSMOSIS TECH SUPPORT
Statement of Work (SOW) For services to USCGC RELIANCE REVERSE OSMOSIS TECH SUPPORT Background and Current Observed Issues CGC RELIANCE is requesting SERVICES to continue troubleshooting PLC issues…
Statement of Work LEGARE PELICAN HOOK DETACHABLE LINK
Description/Specification/Work Statement CGC LEGARE CHAIN STOPPER/PELICAN HOOK AND DETACHABLE LINK (BACKFILL FOR ONES SENT TO MOHAWK) Work Statement CGC LEGARE FY26 SLEP SENT TWO PELICAN HOOK…

9 more in ship building and repairing contracts.

Electronic and Precision Equipment Repair and Maintenance statements of work (14)

Statement of Work for Omnicell Equipment Maintenance
For XT Omnicell Service Renewal FY27 · Department of Veterans Affairs
STATEMENT OF WORK FOR OMNI CELL EQUIPMENT MANITENANCE 1. DESCRIPTION OF SERVICES. Contractor shall provide all management, labor, tools, materials, parts, equipment, and transportation to perform…
Service Maintenance for Anatomic Pathology Equipmen Statement of Work
STATEMENT OF WORK SERVICE MAINTENANCE GENERAL REQUIREMENTS: The effort required hereunder shall be performed in accordance with this Statement of Work and with all other terms and conditions set…
USAMRICD NMR Performance Work Statement
For Preventative Maintenance of Bruker Equipment · Defense Health Agency (DHA)
PERFORMANCE WORK STATEMENT Bruker Nuclear Magnetic Resonance (NMR) Support Services Modification P00001 – updates the serial number for the BCU 1 Cooling Unit. 1. Introduction The U.S. Army Medical…
USAMRIID timsTOF MALDI Performance Work Statement
For Preventative Maintenance of Bruker Equipment · Defense Health Agency (DHA)
PERFORMANCE WORK STATEMENT (PWS) Preventative Maintenance of Bruker timsTOF S/N: 191134200103, Evosep S/N: 1000S00612, and MALDI Biotyper S/N: 189013240736 14 September 2026 Part 1 General…
B.1g - Enclosure G. Statement of Work
P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Subject: Scope of Work for Oxford PlasmaLab 100 tool PLC upgrade or its Equivalent The…
Attachment 1: Performance Work Statement Request for Information SSR ILD Maint and Logistics Service Draft
Performance Work Statement (PWS) EIOD ILD Maintenance and Logistics Support Services Dated 7/03/2024 Revised 5/16/2026 Request for Information (RFI) and Sources Sought Request (SSR) Attachment 1 PWS…

8 more in electronic and precision equipment repair and maintenance contracts.

Commercial and Industrial Machinery and Equipment Repair and Maintenance statements of work (13)

Petroleum Bulk Storage Tank Maintenance Statement of Work
New Jersey Healthcare System Petroleum Bulk Storage Tank Maintenance Statement of Work Summary: The vendor shall provide various services to support the management of petroleum bulk storage tanks at…
Draft Performance Work Statement
For Indoor Firing Range Cleaning · Department of the Army
PERFORMANCE WORK STATEMENT (PWS) FOR Bldg. 1266 Small Arms Range - Cleaning Services 1.0 General: This Performance Work Statement (PWS) defines the requirement to maintain an indoor live-fire range…
Performance Work Statement Boiler Maintenance-Repair Support May 26
PERFORMANCE WORK STATEMENT (PWS) High Pressure Power Boiler Maintenance and Repair Services for the Central Heat and Power Plant Boilers Eielson Air Force Base May 2026 1.0 DESCRIPTION OF SERVICES /…
Performance Work Statement
For LLA Fish Pump - Motor Rewind · Department of the Army
LLA Adult Fish Pump Motors Rewind LLA500285FPMR W912EF26QA035 PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 00 00.00 28 01 11 01.00 28 01 14 00.10 28 01 14 00.90 28 01 22 00.00 28…
Serv Leica RMPM Calibration- Performance Work Statement (Updated) Redacted
For Leica PM, RM and Calibration · Department of the Air Force
PERFORMANCE WORK STATEMENT (PWS) FOR Leica RM/PM Calibration Serv C26-132 Prepared June 18, 2026 By OC-ALC/OBCA Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All…
Statement of Work John Deere Tractor Repair UPDATED
Scope of Work Repair of John Deere Tractor The Contractor shall provide all plant, labor, equipment, materials, and supplies as needed to perform the complete repair to all Caterpillar equipment. The…

7 more in commercial and industrial machinery and equipment repair and maintenance contracts.

Air Traffic Control statements of work (13)

Performance Work Statement
For Fort Bliss Air Traffic Control Services · Department of the Army
AIR TRAFFIC CONTROL SERVICES PERFORMANCE WORK STATEMENT FORT BLISS, TX 11 SEPTEMBER 2026 Table of Contents C.1.0 General Information5 C.1.1 Description of Services5 C.1.2 Background5 C.1.3…
Performance Work Statement Attachment 1 PRS
For Fort Bliss Air Traffic Control Services · Department of the Army
Attachment 1 Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold…
Performance Work Statement Attachment 2 Deliverables
For Fort Bliss Air Traffic Control Services · Department of the Army
ATTACHMENT 2 Deliverables Schedule Deliverable PWS Reference Frequency # of Copies Medium/ Format Submit To A001 Quality Control Plan 1.6.1 Initial: Within 30 days after contract award. Updates: All…
Performance Work Statement Attachment 4 Airfield Small UAS SOP
For Fort Bliss Air Traffic Control Services · Department of the Army
DEPARTMENT OF THE ARMY US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, FORT BLISS 11685 SERGEANT MAJOR BOULEVARD FORT BLISS, TX 79918 AMIM-BLO-A MEMORANDUM FOR…
Performance Work Statement Attachment 5 AIC SUAS Incursion Checklist
For Fort Bliss Air Traffic Control Services · Department of the Army
AIC SUAS Incursion Checklist Record report and verify incursion against approved CONOPs, COAs, DA Form 3502, and/or Triad Restrictions page. DTG (Local) SUAS Type/ Description Altitude (EST) Location…
Performance Work Statement Attachment 6 SUAS Incursion Checklist
For Fort Bliss Air Traffic Control Services · Department of the Army
1 SUAS Incursion Checklist Record report and verify incursion against approved COAs and DA Form 3502. Note. Verify El Paso is not talking to reported SUAS prior to confirming it is unauthorized. □…

7 more in air traffic control contracts.

Other Warehousing and Storage statements of work (13)

Attachment I (A) - Performance Work Statement-Cannon AFB
PERFORMANCE WORK STATEMENT (PWS) for AIRCRAFT/GROUND FUEL SERVICES and FUEL STORAGE AND DISTRIBUTION under SOLICITATION SPE603-26-R-0529 at Cannon AFB, NM Dated: Apr 2, 2026 1 TABLE OF CONTENTS…
Attachment I (B) - Performance Work Statement-Holloman AFB
PERFORMANCE WORK STATEMENT (PWS) for AIRCRAFT/GROUND FUEL SERVICES and FUEL STORAGE AND DISTRIBUTION under SOLICITATION SPE603-26-R-0529 at Holloman AFB, NM Dated: APR 2, 2026 1 TABLE OF CONTENTS…
Attachment I (C) - Performance Work Statement - Davis Monthan AFB
PERFORMANCE WORK STATEMENT (PWS) for AIRCRAFT/GROUND FUEL SERVICES and FUEL STORAGE AND DISTRIBUTION under SOLICITATION SPE603-26-R-0529 at Davis Monthan AFB, AZ Dated: Apr 2, 2026 1 TABLE OF…
Attachment I (D) - Performance Work Statement-Luke AFB
PERFORMANCE WORK STATEMENT (PWS) for AIRCRAFT/GROUND FUEL SERVICES and FUEL STORAGE AND DISTRIBUTION under SOLICITATION SPE603-26-R-0529 at LUKE AFB, AZ Dated: Apr 2, 2026 1 TABLE OF CONTENTS SECTION…
Amendment 6: Attachment I (A) - Performance Work Statement-Cannon AFB
PERFORMANCE WORK STATEMENT (PWS) for AIRCRAFT/GROUND FUEL SERVICES and FUEL STORAGE AND DISTRIBUTION under SOLICITATION SPE603-26-R-0529 at Cannon AFB, NM Dated: Oct 1, 2026 1 TABLE OF CONTENTS…
Amendment 6: Attachment I (B) - Performance Work Statement-Holloman AFB
PERFORMANCE WORK STATEMENT (PWS) for AIRCRAFT/GROUND FUEL SERVICES and FUEL STORAGE AND DISTRIBUTION under SOLICITATION SPE603-26-R-0529 at Holloman AFB, NM Dated: Oct 1, 2026 1 TABLE OF CONTENTS…

7 more in other warehousing and storage contracts.

Electrical Contractors and Other Wiring Installation Contractors statements of work (12)

Performance Work Statement Network Cabling Spokane
B.3 PERFORMANCE WORK STATEMENT (PWS) 1. Title: Network Cabling Services 2. Scope: The technical service provided under this contract supports programs and hospital customers. The scope of this…
Attachment 1: Air Compressor Relocation Statement of Work
For Air Compressor Relocation · Department of the Navy
11 Sep 2026 SUBJECT TITLE: SITE: BLDG: Relocate Air Compressors/ Shed Buildout US NAVAL RESEARCH LABORATORY (NRL), Washington DC 65 The statement of work is described below and is comprised of the…
Statement of Work
SPECIFICATIONS WOMBLE WORK CENTER FIBER OPTIC INSTALLATION USDA FOREST SERVICE OUACHITA NATIONAL FOREST WOMBLE RANGER DISTRICT MT IDA, ARKANSAS SPECIFICATIONS INDEX  DIVISION 01 00 00 GENERAL…
Attachment 2. Statement of Work
Hebgen Lake Ranger District 330 Gallatin Road, West Yellowstone, MT 59758 Network Cabling and IT Room Improvements Statement of Work The following are the items required by this contract to meet…
Attachment 1: Statement of Work Christmas Decor and Lighting Installation
For Edwards AFB Holiday Light & Decor Installation · Department of the Air Force
Statement of Work (SOW) Building Edwards AFB Annual Christmas Décor and Lighting Installation Description of Service: Christmas Décor and Lighting Installation Scope of Work. Contractor shall install…
Attachment 2: Statement of Work
For Micro Gin Motor Control Center Upgrade · Agricultural Research Service
USDA ARS Cotton Ginning Research Unit Statement of Work Micro Gin Controls with Programmable Logic Controllers (PLC) and Human Machine Interface (HMI) General Information (A): A1: The USDA ARS Cotton…

6 more in electrical contractors and other wiring installation contractors contracts.

Testing Laboratories and Services statements of work (12)

Draft Performance Work Statement Viable Surface Sampling VA Central California FY27
For Monthly Viable Surface Sampling · Department of Veterans Affairs
PERFORMANCE WORK STATEMENT Monthly Viable Surface Sampling PURPOSE: The contractor shall provide all labor, supplies, equipment, information technology, transportation, and supervision necessary to…
Tab 04 4 Statement of Work Updated 2
STATEMENT OF WORK 1. Objective/Requirements Parts need to be ordered to fulfill the following: GP00688 will re-establish the Orion scrubber purge capability at MPPF using existing ML2 BAIR hardware.…
STATEMENT OF WORK Revised
STATEMENT OF WORK 1. Scope of Work. The Contractor shall furnish all equipment, supplies, personnel, supervision, transportation, and software to provide medical physicist testing/reporting services…
Statement of Work
For Calibration and Temperature Mapping · Department of the Army
Statement of Work 1. Requirements Possess and provide a current existing certificate of accreditation and/or scope that confirms that the Contractor is accredited by ISO 17025:2017 for calibration…
Performance Work Statement
PERFORMANCE WORK STATEMENT (PWS) Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) Calibration Of Proof Test Machines 1.0 BACKGROUND 1.1 2.0 Pearl Harbor Naval Shipyard &…
Draft Statement of Work
PR: 693JJ927RQ000049 Title: Vehicle Testing for NCAP SECTION C – DESCRIPTION, SPECIFICATIONS, WORK STATEMENT (DRAFT) C.1 BACKGROUND The New Car Assessment Program (NCAP) is a consumer information…

6 more in testing laboratories and services contracts.

Other Aircraft Parts and Auxiliary Equipment Manufacturing statements of work (12)

Performance Work Statement
Appendix A DEPARTMENT OF THE AIR FORCE AIR FORCE SUSTAINMENT CENTER TINKER AIR FORCE BASE, OKLAHOMA 73145 PR NO: FD20301901983 AF CONTRACT NO: DATE: 13 OCTOBER 2026 XXXXX-X PERFORMANCE WORK STATEMENT…
Attachment 2: Statement of Work
For Overhaul Anti-Ice Valve · US Coast Guard
ATTACHMENT 2 - STATEMENT OF WORK 70Z03826QJ0000367 1.0 Contractor Requirements 1.1 The United States Coast Guard (USCG) Aviation Logistics Center (ALC), Medium Range Recovery (MRR) Product Line…
Attachment 2: Statement of Work
For Overhaul - Various Accumulators · US Coast Guard
ATTACHMENT 2 - STATEMENT OF WORK 70Z03826QJ0000306 1.0 Contractor Requirements 1.1 The United States Coast Guard (USCG) Aviation Logistics Center (ALC), Medium Range Recovery (MRR) Product Line…
Performance Work Statement
For Repair of the E-3/C-130H Power Supply · Department of the Air Force
13 MAY 2026 DEPARTMENT OF THE AIR FORCE AIR FORCE SUSTAINMENT CENTER TINKER AIR FORCE BASE, OKLAHOMA 73145 Performance Work Statement (PWS) TYPE OF WORK: Repair of E-3 GINS / C-130H Power Supply…
Performance Work Statement
Appendix A DEPARTMENT OF THE AIR FORCE AIR FORCE SUSTAINMENT CENTER TINKER AIR FORCE BASE, OKLAHOMA 73145 PR NO: FD2030-25-00506 AF CONTRACT NO: DATE: 27 July 2026 FA8118-26-R-0055 PERFORMANCE WORK…
Statement of Work
For F-16 Piston, Reaction Cyl · Defense Logistics Agency
CUI PACKAGING STATEMENT OF WORK April 2025 Preservation, Packaging & Marking Requirements The offeror shall adhere to the AFMC Form 158, Packing Requirements, specified Department of Defense (DoD)…

6 more in other aircraft parts and auxiliary equipment manufacturing contracts.

Custom Computer Programming Services statements of work (12)

AF-PLM Capability Integration Sustainment License Mgmt Performance Work Statement
PERFORMANCE WORK STATEMENT (PWS) FOR AF-PLM CAPABILITY INTEGRATION AND SUSTAINMENT Development of USAF Digital Service Engineering Processes for the AF-PLM Capability Support Office DATE Prepared By…
Draft Performance Work Statement Web Development Services
For Web Sustainment/Content Management/Cloud Hosting · Defense Human Resources Activity
Performance Work Statement (PWS) for Defense Civilian Personnel Advisory Service (DCPAS) Web Sustainment/Content Management/Cloud Hosting 1.0 INTRODUCTION: The Defense Civilian Personnel Advisory…
DMAC 3 Request for Information Performance Work Statement
For Depot Maintenance Applications Consolidated 3 · Department of the Air Force
Depot Maintenance Applications Consolidation (DMAC) 3 Performance Work Statement (PWS) (FA877026RB008) Version 1.00 EXECUTIVE SUMMARY The Air Force Materiel Command (AFMC), Air Force Life Cycle…
Attachment 1: Jury Management Solution Performance Work Statement
For Jury Management Solution (JMS) System · Administrative Office of the US Courts
USCA27R0009 - Attachment 1 - Section C Jury Management Solution (JMS) Performance Work Statement 1.0 Background The Administrative Office of the U.S. Courts (AO) (Government) currently operates a…
SS Draft - Attachment 1 - Draft STATEMENT OF OBJECTIVES - Software Development and Technical Support
For High-Performance Computing Software Development and Technical Services · National Oceanic and Atmospheric Administration
DRAFT DOCUMENT Department of Commerce National Oceanic & Atmospheric Administration Office of Oceanic & Atmospheric Research Geophysical Fluid Dynamics Laboratory and Office of the Chief Information…
SS Draft - Attachment 2 - Draft PERFORMANCE WORK STATEMENT - OBJECTIVE 1 Adaptive Earth System Model Development
For High-Performance Computing Software Development and Technical Services · National Oceanic and Atmospheric Administration
DRAFT DOCUMENT 1.0 Background and Scope T PERFORMANCE WORK STATEMENT Objective 1: Adaptive Earth System Model Development AF The Contractor shall provide agile, high-performance scientific software…

6 more in custom computer programming services contracts.

All Other Professional, Scientific, and Technical Services statements of work (10)

Attachment 1. MN ARB Performance Work Statement-POL
CUI Performance Work Statement (PWS) Cleaning, Inspection, and Hazardous Waste Removal for Two 10,000-Gallon Oil/Water Separators 1.0 Scope of Work The contractor shall provide all personnel…
Attachment 1: Statement of Objectives Agile Professional Services
STATEMENT OF OBJECTIVES (SOO) Agile Professional Services (APS) U.S. Army Capability Program Executive Simulation, Training, Test and Threat PURPOSE The purpose of this acquisition is to obtain Agile…
Attachment 5: Performance Work Statement Template Agile professional Services
Performance Work Statement (Includes associated Performance Requirements Summary (PRS) The Offeror shall tailor this example document to the Acquistion of Professional Services (APS) Requirement.…
Attachment 1: Performance Work Statement
For 711th HPW Mission Support Services MAC IDIQ · Department of the Air Force
Attachment 1 FA2369-26-R-B008 PERFORMANCE WORK STATEMENT (PWS) FOR 711TH HUMAN PERFORMANCE WING MISSION SUPPORT SERVICES 20 March 2025 1.0 BACKGROUND The 711th Human Performance Wing (711 HPW) of the…
Attachment 1: Performance Work Statement - Amendment 6
For 711th HPW Mission Support Services MAC IDIQ · Department of the Air Force
Attachment 1 2396-26-R-B008 PERFORMANCE WORK STATEMENT (PWS) FOR 711TH HUMAN PERFORMANCE WING MISSION SUPPORT SERVICES 2 October 2026 1.0 BACKGROUND The 711th Human Performance Wing (711 HPW) of the…
Performance Work Statement - DAMES IDIQ - Draft
For Data & AI Mission Expert Services (DAMES) IDIQ · Department of the Air Force
FA7014‐XX-X-XXXX Page 1 of 25 PERFORMANCE WORK STATEMENT FOR Data & AI Mission Expert Services (DAMES) IDIQ AT PENTAGON 28 September 2026 DRAFT FA7014‐XX-X-XXXX Page 2 of 25 Contents SECTION I 4 1.0…

4 more in all other professional, scientific, and technical services contracts.

More statements of work

Performance Work Statement 750kW EDG Redacted
6188-1350 Performance Work Statement
Attachment 2: Statement of Work Compliance Checklist
6146-1356 NUC TSDS EDG Performance Work Statement
For N4523A26Q5740 -500KW EDG · Department of the Navy
Statement of Work AC Units with Heaters-draft
For Rental of AC Unit with Heaters · Department of the Navy
Performance Work Statement 1 YEAR FORKLIFT IDIQ 6278-9580 Redacted
Attachment 1: Performance Work Statement Fencing
For 10-Miler Fencing · Department of the Air Force
Attachment 1: Statement of Work
For FY27 Nursing Practice Oversight Course (NPOC) · Department of the Air Force
Attachment 4: Tomah Mobile MRI Lease Statement of Work
LTBMU Snow Removal Statement of Work
Attachment 1 -Performance Work Statement Grounds (FY27)
For DCDO Grounds · Department of the Air Force
Performance Work Statement Grounds (FY27) updated22Oct
For DCDO Grounds · Department of the Air Force
Attachment 1: Statement of Work
For Snow Removal + Hauling BPA · Department of the Air Force
Statement of Work FY27 Sod HNC
Statement of Work FSH Sod
Attachment 1: Performance Work Statement Snow and Ice Removal 10 5 2026
For DCF Snow and Ice Removal Services · Bureau of Engraving and Printing
Statement of Work Gardening Contract
J-1 W-MKC Weed Statement of Work
Attachment 1: Statement of Work
For Smartsheet Licenses for OTS · Bureau of Indian Affairs
Statement of Work NOI Document
For Limited Source Name Brand Notice of Intent · Washington Headquarters Services (WHS)
Attachment A - Statement of Work (Amendment 2)
Tab 04 4 Statement of Work Redacted
For FY27 SIMULIA Wave6 Renewal · National Aeronautics and Space Administration
OLMS Performance Work Statement
Performance Work Statement Inbound Tracking System
ClientMaint and ProfSrvcs Statement of Work
For Request for Information - Message Operations and Information Exchange Support · National Geospatial-intelligence Agency (NGA)
Statement of Work ASISTOSoftwareMaintAgreement 2026
Attachment 2: Statement of Work and Specification
For GAOA Pine Creek Vault Toilet HTNF · Forest Service
UPDATED Statement of Work GUSG Hydro Restoration v 10 20 2026 0003
For GUSG Habitat Hydro-Logic Restoration 202 · Bureau of Land Management
Attachment 1: Fort Sill NC Invitation for Bids Statement of Work
Attachment 4: Statement of Work Stove Prairie CG Replacement
Statement of Work Corinth GSE and Cem Improvements
Attachment - Fort Bliss NC Statement of Work
Attachment 3: Statement of Work
For GAOA Grizzly Bear Campground · Forest Service
Attachment 1: Statement of Work
For Cableway Crane Refurbishment · Bureau of Reclamation
Attachment A- Draft MBSOA Performance Work Statement
For Mortgage-Backed Securities Operations & Analytics (MBSOA) · Department of Housing and Urban Development
Statement of Objectives Learning Systems Draft
USBP-PMOD IST Performance Work Statement BPTOC-Enterprise
Statement of Objectives EIDS DxP v2
Performance Work Statement
For MCC Software Development Recompete · Millennium Challenge Corporation
Attachment 1: TEIS IV Revised Performance Work Statement