Attachment 1: Statement of Work

Updated

A PDF document (1.3 MB) attached to Gate Valve Frame Replacement, from the Department of the Air Force. Due Nov 27, 2026, 1:00 PM (UTC-6).

File name: Attachment 1 - Statement of Work.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

FA460826QS053

Attachment 1

1 September 2026

STATEMENT OF WORK/SPECIFICATIONS

FOR REPLACEMENT OF FLAG LAKE GATE VALVE FRAME STRUCTURE

Natural Resources Office
6141 Range Road, Barksdale AFB, LA 71110
BACKGROUND: The existing water control gate valve at Flag Lake has a frame that is corroded to the point that the gate will not slide up and down the frame without hanging up. This contract is to have two vertical frame pieces and one horizontal brace replaced and some additional drilling and fitment of the top headrail to those same vertical pieces. Natural Resources Office, 6141 Range Road, Barksdale AFB, LA 71110.
JUSTIFICATION: This valve allows the lowering of Flag Lake below the minimal amount capable by utilization of the lake spillway. Periodically the lake needs to be lowered during the summer to promote decay of organic debris on the bottom of the lake shoreline. This valve is the only way that can be accomplished.
Additionally, it is utilized during extreme high-water events to lower the lake back to normal pool level, assisting the spillway. DESCRIPTION: This project involves replacing two rusted vertical frame pieces and one horizontal brace of the original gate valve structure. The primary connection of the gate valve to the existing concrete headwall occurs at the lower section of these frame pieces. The old frame will have to be unbolted from the headwall, new components replaced and then the structure with the new components installed will have to be reattached to the headwall in accordance with gate manufacturers specifications. Upon completion the gate should be fully functional, opening and closing freely from proper sealing at closure to fully open. The existing top headrail has been replaced previously, and several bolt holes will need to be drilled to properly attach the headrail to the new vertical braces. In addition, there is an existing electric motor driven gate actuator mounted to the headrail that will need to be removed and reattached during this process.
MATERIALS: The replacement vertical frame rails and the horizontal brace will be provided by the government, including connecting hardware as provided by the manufacturer.
SITE CLEANUP: Site Condition: The Contractor shall maintain the work site in a neat, safe, and orderly manner always. Upon completion of all mechanical work, the Contractor shall remove all tools, equipment, staging materials, and residual debris. The job site, surrounding shoreline, and access pathways must be restored to a condition equal to or better than the existing condition at project