Combined Synopsis Solicitation
Updated
A PDF document (304 KB) attached to Gate Valve Frame Replacement, from the Department of the Air Force. Due Nov 27, 2026, 1:00 PM (UTC-6).
File name: Combined Synopsis Solicitation - FA4608QS053.pdf
The full file is for paid members, or buy this bid alone.
Preview
FA460826QS053
Combined Synopsis – Solicitation
This is a combined synopsis/solicitation for commercial services prepared in accordance with (IAW) part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA460826QS053 is issued as a request for quotation (RFQ), for Flag Lake Gate Valve Frame Replacement. This acquisition will be full and open competition. This document primarily incorporates provisions and clauses by reference IAW Federal Acquisition Circular (FAC) 2026-01, effective 13 March 2026 and the Revolutionary FAR Overhaul (RFO) as applicable. Full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
Notice to Offerors:
The government reserves the right to cancel this solicitation, either before or after the closing date for receipt of quotations. In the event the government cancels this solicitation, the government has no obligation to reimburse an offeror for any costs. If funds are not available to fund the entire contract value, the Government reserves the right to re-evaluate quotations by unit price per service and issue an award on a SOME, NONE, or ALL basis for each individual service needed. Description of Requirement:
The purpose of this requirement is to replace two (2) rusted vertical frame pieces and one (1) horizontal brace of the original gate valve assembly. Work requires temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications. Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure. The contractor shall provide all logistics, labor, tools, and the lawful disposal of all materials and removed components IAW Attachment 1, Statement of Work, Dated 01 Sep 2026. Period of Performance:
90 Days
Contract Line Item Number (CLIN):
CLIN Service Description
0001
Quantity
Gate Valve Frame Replacement Services 1
IAW Attachment 1,
Statement of Work, Dated 01 Sep 2026
The beginning of the document. Download the full file to read on.