Attachment 26: Performance Work Statement Annex C - Transportation PRS
Updated
A PDF document (259 KB) attached to EAGLE Ft. Carson CO W519TC-27-R-A014, from the Department of the Army. Due Jan 4, 2027, 12:00 PM (UTC-6).
File name: B08 Att 0026 PWS Annex C - Transportation PRS.pdf
The full file is for paid members, or buy this bid alone.
Preview
PWS Annex C - Transportation Performance Requirement Summary (PRS) Task/Requirement
Standard
Sampling Method, Lot & Acceptable
Quality Level (AQL)
TRANSPORTATION - GENERAL
5.26.3
Provide reports and statistical
data
Timeliness: Reports and statistical data
delivered by the due date.
Quality: IAW DLRS ITD-01 Accurate and
complete
Surveillance activity report
Lot: Inspect reports submitted per
quarter.
AQL: 95%
FLEET MANAGEMENT OPERATIONS
5.29.1
Control & Account for GSA
vehicles, keys, and credit cards
report loss/abuse
Timeliness: By COB daily notify COR
upon discovery.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt
completed at time of surveillance.
AQL: 99%
5.29.1
Maintain hand receipts on GSA
vehicles
Timeliness: Hand receipts updated
annually, as a minimum.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt
completed at time of surveillance.
AQL: 98%
5.29.1
Pick up and deliver vehicles
Timeliness: Vehicles pickup within (5)
business days when notified.
Quality: Pick up & delivery to
designated area.
Random sampling
Lot: Each vehicle requiring pickup and
delivery completed at time of
surveillance.
AQL: 98%
5.29.1
Maintain a copy of justification
on each motor vehicle utilized
for official use and notify users
when it is due to expire
excluding LSEV.
Timeliness: Annually
Random sampling
Quality: Justification must meet the
requirements of AR 58-1.
Lot: GSA vehicle justifications prepared
each year.
AQL: 100%
PWS Annex C - Transportation Performance Requirement Summary (PRS) Task/Requirement
5.29.11
Schedule for Maintenance of
GSA vehicles.
Standard
Timeliness: Users notified 5 business
days prior to scheduled maintenance
date
Quality: Scheduled maintenance
performed.
Sampling Method, Lot & Acceptable
Quality Level (AQL)
Surveillance activity checklist
Lot: Each GSA vehicle requiring
maintenance completed at time of
surveillance.
AQL: 95%
UNIT MOVEMENTS
5.30.1
Provide necessary assistance to
the Unit Movement Coordinator
(UMC) with unit movement
data maintenance and
movement planning.
Timeliness: Meet UMC’s processing
times.
5.30.1
Document loaded equipment
Properly
Timeliness: Upon completion of
loading.
Surveillance activity checklist
Lot: Each unit move
Quality: All unit moves completed as
required.
Quality: Load data will be obtained
The beginning of the document. Download the full file to read on.