Home / EAGLE Ft. Carson CO W519TC-27-R-A014 / Document

Attachment 26: Performance Work Statement Annex C - Transportation PRS

Updated

A PDF document (259 KB) attached to EAGLE Ft. Carson CO W519TC-27-R-A014, from the Department of the Army. Due Jan 4, 2027, 12:00 PM (UTC-6).

File name: B08 Att 0026 PWS Annex C - Transportation PRS.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PWS Annex C - Transportation Performance Requirement Summary (PRS) Task/Requirement

Standard

Sampling Method, Lot & Acceptable
Quality Level (AQL)

TRANSPORTATION - GENERAL

5.26.3
Provide reports and statistical
data

Timeliness: Reports and statistical data
delivered by the due date.
Quality: IAW DLRS ITD-01 Accurate and
complete

Surveillance activity report
Lot: Inspect reports submitted per
quarter.

AQL: 95%

FLEET MANAGEMENT OPERATIONS

5.29.1
Control & Account for GSA
vehicles, keys, and credit cards
report loss/abuse

Timeliness: By COB daily notify COR
upon discovery.
Quality: Complete & accurate

Random sampling
Lot: Each GSA vehicle hand receipt
completed at time of surveillance.
AQL: 99%

5.29.1
Maintain hand receipts on GSA
vehicles

Timeliness: Hand receipts updated
annually, as a minimum.
Quality: Complete & accurate

Random sampling
Lot: Each GSA vehicle hand receipt
completed at time of surveillance.
AQL: 98%

5.29.1
Pick up and deliver vehicles

Timeliness: Vehicles pickup within (5)
business days when notified.
Quality: Pick up & delivery to
designated area.

Random sampling
Lot: Each vehicle requiring pickup and
delivery completed at time of
surveillance.
AQL: 98%

5.29.1
Maintain a copy of justification
on each motor vehicle utilized
for official use and notify users
when it is due to expire
excluding LSEV.

Timeliness: Annually

Random sampling

Quality: Justification must meet the
requirements of AR 58-1.

Lot: GSA vehicle justifications prepared
each year.
AQL: 100%

PWS Annex C - Transportation Performance Requirement Summary (PRS) Task/Requirement

5.29.11
Schedule for Maintenance of
GSA vehicles.

Standard

Timeliness: Users notified 5 business
days prior to scheduled maintenance
date
Quality: Scheduled maintenance
performed.

Sampling Method, Lot & Acceptable
Quality Level (AQL)
Surveillance activity checklist
Lot: Each GSA vehicle requiring
maintenance completed at time of
surveillance.
AQL: 95%

UNIT MOVEMENTS

5.30.1
Provide necessary assistance to
the Unit Movement Coordinator
(UMC) with unit movement
data maintenance and
movement planning.

Timeliness: Meet UMC’s processing
times.

5.30.1
Document loaded equipment
Properly

Timeliness: Upon completion of
loading.

Surveillance activity checklist
Lot: Each unit move

Quality: All unit moves completed as
required.

Quality: Load data will be obtained

The beginning of the document. Download the full file to read on.

Other documents in this bid