Home / EAGLE Ft. Carson CO W519TC-27-R-A014 / Document

Attachment 24: Performance Work Statement Annex A - Maintenance PRS

Updated

A PDF document (260 KB) attached to EAGLE Ft. Carson CO W519TC-27-R-A014, from the Department of the Army. Due Jan 4, 2027, 12:00 PM (UTC-6).

File name: B08 Att 0024 PWS Annex A - Maintenance PRS.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PWS Annex A – Maintenance Performance Requirement Summary (PRS) Task/Requirement

Sampling Method, Lot & Acceptable
Quality Level (AQL)

Standard

MATERIEL MAINTENANCE – GENERAL

5.1.1
Establish, operate, and manage
equipment repair shops, and
supporting functions.

Quality: IAW AR 750-1, DA PAM 750-8,
applicable LIS publications, installation
policies and procedures, external and
internal SOPs, and materiel
maintenance and ISM Operating
Manual.

Random sampling (shop/activity
scheduled periodically)
Lot: All in-process and completed work
as well as all existing records and files
within the shop or activity undergoing
surveillance.
AQL: 95%

5.1.4
Perform technical inspections in
accordance with the
maintenance request.

Quality: IAW AR 750-1, DA PAM 750-8,
applicable LIS publications, installation
policies and procedures, external and
internal SOPs, and materiel
maintenance (COR) guidance.

Random (shop/activity scheduled
periodically)
Lot: All in-process and completed work
orders, files, logs, and SOPs at time of
surveillance.
AQL: 95%

MATERIEL MAINTENANCE SUPPORT

5.2.1
Perform repairs IAW work
request and applicable
equipment TMs or equivalent
publications.

Random sampling
Quality: Repairs will be IAW the
maintenance request and to
standards, to include estimated task
times, as stated in current equipment
Technical Manuals (TMs), Technical
Bulletins (TBs), Modification Work
Orders (MWOs), Safety of Use
Messages (SOUMs), Special Technical
Inspection and Repairs (STIRs), other
applicable Government technical
publications, or OEM equivalent
publications when a Government
technical publication is not available.

Lot: All in-process and completed work
as well as all existing records and files
within the shop or activity undergoing
surveillance.
AQL: 95%

PWS Annex A – Maintenance Performance Requirement Summary (PRS) Task/Requirement

5.2.1
Ensure minimum rejection rates
for mechanical and electrical
repair work completed are met
in order to meet first time pass
rates.

5.2.12
Perform all air conditioning &
refrigeration maintenance /
repair services.

Standard

Quality: IAW AR 750-1, Appendix B-11,
paragraphs (a-d)

Sampling Method, Lot & Acceptable
Quality Level (AQL)
Random (shop/activity scheduled
periodically)
Lot: Equipment that has completed the
repair cycle and has been deemed as
ready for issue (RFI) back to the

The beginning of the document. Download the full file to read on.

Other documents in this bid