STATEMENT OF WORK (SOW)

Project Number: 637-22-102
Project Title: Renovate Space for Patient Improvements
Location: Asheville VA Medical Center, Building 47 – First Floor Department: Western North Carolina VA Health Care System (WNCVAHCS)

1. OVERVIEW

The Western North Carolina VA Health Care System (WNCVAHCS) requires a General Contractor (GC) to provide construction services for the renovation of approximately 3,500 square feet of clinical space located on the first floor of Building 47. Renovation includes improvements to the ENT and Podiatry patient care areas, creation of a new waiting area, modernization of exam rooms, increased storage capacity, and upgrades to meet current codes and VA design standards. Work shall be performed in accordance with the construction drawings and the VA Final Bid Specifications (Divisions 01–28).

2. SCOPE OF WORK

2.1 Architectural and General Construction

The contractor shall complete all demolition, construction, installation, and finish work required, including:
• Interior demolition of partitions, ceilings, finishes, mechanical, electrical, and plumbing elements • Installation of metal framing, gypsum board assemblies, acoustical ceilings, interior doors, frames, hardware, casework, and countertops
• Application of finishes including resilient flooring, tile, paint, wall protection, signage, and trim • Restoration and protection of adjacent occupied areas

2.2 Mechanical (HVAC) Work

Contractor shall:
• Remove existing mechanical systems serving the renovation area • Install new VAVs, ductwork, thermostats, diffusers, exhaust fans, and mechanical controls • Perform HVAC testing, adjusting, and balancing (TAB)
• Complete full HVAC commissioning per VA Master Specification 23 series

2.3 Electrical Work

Contractor shall:
• Demolish existing electrical infrastructure within the designated area • Install a new transformer, electrical panel, wiring, raceways, receptacles, lighting, and lighting

controls
• Perform electrical system commissioning

2.4 Plumbing Work

Contractor shall:
• Remove existing plumbing fixtures, piping, and supporting components to the mains • Install new fixtures, supply and waste piping, valves, and insulation • Conduct commissioning per Specification 22 08 00

2.5 Fire Protection

Contractor shall:
• Modify, relocate, and/or replace sprinkler heads
• Replace CPVC piping with black iron as required
• Provide fire alarm system modifications and testing
• Commission fire suppression systems per Division 21