Home / 654-24-004 | Remediate Old Parking Garage / Document

Attachment Drawings Remediate Old Parking Garag

Updated

A PDF document (1.5 MB) attached to 654-24-004 | Remediate Old Parking Garage, from the Department of Veterans Affairs. Due Nov 20, 2026, 3:00 PM (UTC-8).

File name: Attachment Drawings Remediate Old Parking Garag.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

BRIDGING DOCUMENTS

VA U.S. Department of Veterans Affairs

A

Project Name:
Project Address:

B

A

PARKING GARAGE STRUCTURAL EVALUATIONS

RENO VAMC, 975 KIRMAN AVENUE, NV 89502

B

C

C

DRAWING SHEET INDEX

G-001

COVER PAGE

S-001

STRUCTURAL NOTES AND ABBREVIATIONS

S-100

GROUND LEVEL DAMAGE PLAN

S-100.1

2ND LEVEL DAMAGE PLAN

S-101

REPAIR DETAILS (1)

S-102

REPAIR DETAILS (2)

D

D

E

E

PROJECT SCOPE

F

F

CONSULTANTS

ARCHITECT/ENGINEER OF RECORD

Drawing Title

STAMP

Office of
Construction
and Facilities
Management

248 Copeland Street
Quincy, MA 02169
P: 617-481-6390
F: 617-687-5990

VA FORM 08 - 6231

Phase

BRIDGING DOCUMENTS

NOT FOR CONSTRUCTION

STRUCTURAL NOTES

Approved:

Project Number

PARKING GARAGE REPAIR

Location

U.S. Department
of Veterans
Affairs

Project Title

Building Number

BUILDING 13

Reno VAMC
975 Kirman Ave
Reno, NV 89502

Drawing Scale

N/A

Issue Date

Checked

Drawn

06.26.2026

QS

HA

Drawing Number

G-001

CONCRETE FOR WEATHER EXPOSED STRUCTURE:

1.

HANDRAIL DESIGN SHALL FOLLOW IBC 2018 CHAPTER 1014.

GENERAL NOTES

1.

ALL CONCRETE CONSTRUCTION SHALL CONFORM ACI 301 "SPECIFICATION FOR STRUCTURAL CONCRETE", ACI 305.1, ACI 306.1 UNLESS OTHERWISE NOTED.

2.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND STAMP THE SHOP DRAWINGS BEFORE SUBMITTAL.

3.
2.

ALL DETAILING, FABRICATION AND PLACING OF REINFORCING REBARS, UNLESS OTHERWISE NOTED, SHALL CONFORM TO ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE", ACI 117 AND THE ACI DETAILING MANUAL.

SUBMIT FINAL SHOP DRAWINGS INCORPORATING REVIEW COMMENTS/CHANGES TO THE STRUCTURAL ENGINEER OF RECORD FOR RECORD FOR RECORD ONLY.

GENERAL NOTES ON THIS DRAWING REFER ONLY TO STRUCTURAL WORK WITH SCOPE OF WORK LIMITED TO GARAGE REPAIR.
THE STRUCTURAL NOTES ARE INTENDED TO COMPLEMENT THE PROJECT SPECIFICATIONS WHICH ARE PART OF THE CONTRACT DOCUMENTS. SPECIFIC NOTES AND DETAILS ON THE DRAWINGS SHALL GOVERN OVER STRUCTURAL NOTES AND TYPICAL DETAILS.

3.

WORK SHALL CONFORM TO APPLICABLE BUILDING CODES, ORDINANCES, AND REGULATIONS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES AND PROCEDURES EMPLOYED IN THE PERFORMANCE OF WORK.

4.

THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST TO THE STRUCTURAL ENGINEER OF RECORDS BEFORE PROCEEDING WITH ANY CHANGES, SUBSTITUTIONS OR MODIFICATIONS. ANY WORK EXECUTED BY THE CONTRACTOR WITHOUT RECEIVING WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER OF RECORD WILL BE AT CONTRACTOR'S OWN RISK.

5.

THE CONTRACT DOCUMENTS REPRESENT THE COMPLETED STRUCTURE. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE TEMPORARY SHORING AND BRACING FOR STRUCTURAL ELEMENTS UNTIL THE ENTIRE

The beginning of the document. Download the full file to read on.

Other documents in this bid