Attachments
Updated
A PDF document (2.0 MB) attached to Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT, from the Department of the Army. Due Nov 5, 2026, 5:00 PM (UTC-5).
File name: Attachments 27QA001.pdf
The full file is for paid members, or buy this bid alone.
Preview
Informational Photos
Image 1: Aerial photo showing where concrete pad is to be placed and where existing underground conduit is.
30’
Image 2: Aerial photo showing conduit span to gate operator stairs/ pull box. Pull box at stairs has surface mounted 30’ of 2” PVC conduit extending to the wood control panel.
Image 3: Photo showing the proposed site for the generator pad, fence, propane tanks and generator. Tree and stump will be removed before the start of contract. The center of the new pad will be in the location of the existing tree.
Image 4: Photo showing the proposed site from another angle
Image 5: Photo showing the generator pull box in line with the pull box on the stairs. 130’ of conduit is ran from this point across to the stairs.
Image 6: Photo showing the pull box on the stairs and the run to the generator pull box.
The beginning of the document. Download the full file to read on.