Bid document
Updated
A PDF document (164 KB) attached to Dry Cargo Tugcon, from the Department of the Navy. Due Nov 18, 2026, 11:00 AM (UTC-5).
File name: SS-26-012.pdf
The full file is for paid members, or buy this bid alone.
Preview
12 NOVEMBER 2025
THIS IS THE MILITARY SEALIFT COMMAND NORFOLK, STRATEGIC SEALIFT
PROGRAM SUPPORT OFFICE, N103A
SOURCES SOUGHT NOTICE NO.: N32205-SS-PM4-26-012
SUBJECT: DRY CARGO TUGCON; OPEN-OCEAN TOW MISSION
1. THIS IS MARKET RESEARCH CONDUCTED BY THE PM4 PROGRAM OFFICE OF
MSC. IT IS A REQUEST FOR INFORMATION ONLY, AND YOUR RESPONSE WILL
NOT BE CONSIDERED AN OFFER. THIS REQUEST FOR INFORMATION DOES NOT
COMMIT THE GOVERNMENT TO PAY ANY COSTS INCURRED IN THE
PREPARATION OR SUBMISSION TO THIS SOURCES SOUGHT NOTICE OR TO
CONTRACT FOR SERVICES.
2. MSC REQUESTS INFORMATION ABOUT THE PRICE AND AVAILABILITY OF A
U.S. FLAG, OCEAN-GOING CERTIFIED TUG CAPABLE OF TOWING BERTHING
BARGE YRBM-32 “IAW THE U.S. NAVY TOW MANUAL (SL740-AA-MAN-010)”
FROM JOINT BASE PEARL HARBOR-HICKAM TO PUGET SOUND NAVAL
SHIPYARD, BREMERTON, WA DURING THE PERIOD OF 05 JANUARY - 23
JANUARY 2026. THE REQUIREMENT IS FOR ONE VOYAGE.
3. DESCRIPTION OF THE TOW:
• ONE YRBM-32 BERTHING BARGE
• DISPLACEMENT – 688 MT
• LENGTH – 146’ 9 5/8”
• BEAM – 46’ 9 3/8”
• MAX DRAFT – 7’ 3”
4. PORT(S)/PLACE(S) OF DEPARTURE: JOINT BASE PEARL HARBOR-HICKAM (USA), PIER LOCATION TO BE DETERMINED.
5. LAYTIME: FOUR (4) DAYS FOR THE ENTIRE MISSION
6. PORT(S)/PLACE(S) OF DESTINATION: PUGET SOUND NAVAL SHIPYARD, BREMERTON, WA, PIER LOCATION TO BE DETERMINED.
7. LAYDAYS: COMMENCING: 29 DECEMBER 2025
CANCELLING: 05 JANUARY 2026
8. TUG REQUIREMENTS:
• VESSEL/TUG SHALL BE BUILT IN 1970 OR LATER
• BOLLARD PULL: SUFFICIENT TO TOW YRBM-32 BARGE AT A MINIMUM TOW
SPEED OF SIX (6) KNOTS FOR FIVE (5) KNOT SOA IN BEAUFORT 5
CONDITIONS. MAXIMUM TOW SPEED TO BE CALCULATED IAW THE U.S. NAVY TOW MANUAL.
• INTERNET AND SATELLITE PHONE CAPABILITY.
• OWNERS MUST PROVIDE TOW BRIDLE AND HARDWARE, EMERGENCY TOW
LINES, FLOODING ALARMS, NAVIGATION LIGHTS AND DAY SHAPES IAW
THE COLREGS RULES OF THE ROAD AND PERFORM NONDESTRUCTIVE
TESTING OF TOW VESSEL DECK FITTINGS FOR SUBMISSION IN A
COMPREHENSIVE TOW PACKAGE. NAVIGATION LIGHTS AND A PERMANENT
FIXTURE WITH DAY SHAPE (BLACK DIAMOND) ARE ALREADY INSTALLED
ON THE BERTHING BARGE.
• OWNERS MUST PREPARE AND SUBMIT A COMPREHENSIVE TOWING
PACKAGE FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF
TOW. THIS PACKAGE INCLUDES, BUT IS NOT LIMITED TO:
o A COMPLETED APPENDIX H FROM THE US NAVY TOWING MANUAL
WITH ASSOCIATED DETAIL
o STEADY STATE TOW LINE TENSION CALCULATIONS OVER THE
SPECTRUM OF ANTICIPATED WEATHER CONDITIONS ALONG THE
TOW ROUTE
o SPEEDS OF ADVANCE (SOA)
o WEATHER CONDITIONS AND LIMITS
o A SKETCH OF THE TOW CONFIGURATION WHICH IDENTIFIES ALL
The beginning of the document. Download the full file to read on.