Home / Recuperator Press Modification Replacement / Document

CSO-AoI Recuperator Press Modification-Replacement Phase 1-September 28 2026

Updated

A PDF document (161 KB) attached to Recuperator Press Modification Replacement, from the Department of the Army. Due Oct 28, 2026, 10:00 AM (UTC-5).

File name: CSO-AoI Recuperator Press Modification-Replacement Phase 1-September 28 2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Federal Agency: Army
Office: Army Contracting Command-Anniston Army Depot (ACC-ANAD) AoI Title: Building 133 Recuperator Press Modification / Replacement CSO AoI Number: AoI A0017
AoI Release Date: September 28, 2026
AoI Phase 1 Close Date: October 28, 2026, at 10:00 AM CDT. CSO Procedure: W911KF-25-S-C002

1. General Information

1.1 Introduction

The purpose of this announcement is for the modification or replacement of a Recuperator Press under the ACC-ANAD Commercial Solutions Opening-Area of Interest (CSO-AoI) W911KF-25-S-C002- A0017. Interested parties are highly encouraged to visit the Government Point of Entry (www.sam.gov) to review the ACC-ANAD CSO special posting in its entirety to obtain more information on the process for submission evaluation of the CSO-AoI responses.
This CSO-AoI seeks to solicit innovative solutions or new capabilities throughout this posting. ACC-ANAD is not obligated to extend a request for proposal or make an award as a result of this CSO AoI; all awards are subject to the availability of funds and successful negotiations. This CSO-AoI is not an authorization to begin performance, and in no way obligates the Government for any costs incurred by the Offeror associated with developing a response. Prior to commencement of any activities associated with performance under this CSO-AoI, the Government will issue a written appropriate consideration established. ACC-ANAD reserves the right to modify the requirements of this CSO-AoI at any time. The authority to issue this CSO-AoI is derived from ACC-ANAD W911KF-25-S-C002 dated 04 April 2026. The CSO is issued under the authority of 10 U.S.C. §3458, as amended by Section 1823 of the National Defense Authorization Act for Fiscal Year 2026.

1.2 AoI Background

Anniston Army Depot is the designated Center of Industrial and Technical Excellence (CITE) for tracked and wheeled ground combat vehicles (minus Bradley), towed and self-propelled artillery, assault bridging systems, individual and crew served small caliber weapons and locomotives, rail equipment and non-tactical generators.

1.3 Identify AoI Solution

This AoI seeks innovative solutions to modify or replace the custom 60-Ton 4-Cylinder Hydraulic Recuperator Press to ensure obsolete parts are updated and autonomation is incorporated in the recuperator pressing process at ANAD. The Government is open to considering multiple solution paths and encourages vendors to propose innovative approaches within the meaning of DFARS 212.7001 that enhance system reliability and application

The beginning of the document. Download the full file to read on.

Other documents in this bid