EXISTING TELECOM

WALL FIELD

A

A

25-PAIR COPPER TO

ADMIN BLDG

WALL HEIGHT

106'-0"

COPPER

PROTECTION

MODULE

C2

NETWORK

SWITCH

INTRUSION

DETECTION

SYSTEM WITH

WIRELESS

FIBER PATCH CORD

NETWORK SWITCH

EXISTING TELECOM WALL FIELD.

MODULAR PATCH

PANEL

WAP FOR FIRE

ALARM PANEL

B

B

T301

FIBER OPTIC

PANEL

C2

(2) 6-STRAND FIBERS

TO ADMIN BLDG

2" CONDUIT

LEVEL

FIRST

LEVEL

100'-0"
100'-0"

R1

EXISTING EQUIPMENT ROOM LAYOUT

C
N

1/2" = 1'-0"

NOTES:

EXISTING TELECOM WALL FIELD ELEVATION

C

1" = 1'-0"

NOTES:

ORT H

1.

1.

REMOVE ALL LOW VOLTAGE CABLING AND DEVICES BACK TO ITS SOURCE AND REMOVE ALL EQUIPMENT. COORDINATE WITH VA OIT FOR THE REMOVAL OF ALL TELEPHONE AND NETWORK EQUIPMENT PRIOR TO CABLE REMOVAL.

REMOVE ALL LOW VOLTAGE CABLING AND DEVICES BACK TO ITS SOURCE AND REMOVE ALL EQUIPMENT. COORDINATE WITH VA OIT FOR THE REMOVAL OF ALL TELEPHONE AND NETWORK EQUIPMENT PRIOR TO CABLE REMOVAL.

LEVEL

CEILING

HEIGHT

110'-0"
110'-0"

KEYNOTES:

1.
2.

SWITCH LOCATED ON FILE CABINET ON ADJACENT WALL.
IDS SYSTEM LOCATED ON ADJACENT WALL.

SC-CT-1

12"x4"

SC-TTB

AC-SCP-1

SC-CAB-2

SC-LR-1

12"x1 1/2"
(TYP)

SC-GND-2

+84"

SC-LR-1

12"x1 1/2"

SC-LR-1

12"x1 1/2"
(TYP)

D

D

AC-SCP-1

SC-TTB

(TYP.)

WALL HEIGHT

106'-0"

SC-CAB-2

6/12/2026 10:51:23 AM

SC-GND-2

+84"

SC-FDC-1

SC-HWM-1

SC-MPP-1

SC-GND-3

GFGI NETWORK SWITCH

SC-CT-1

12"x4"
(TYP)

T301
TE
-

TE
-

SC-HWM-1

SC-NS-1

CM-1
01-07

SC-UPS

SC-PDU-1

SC-PDU-1

E

E

SC-UPS

F

PW-CPW-1

(TYP OF 2)

Autodesk Docs://24001019.06 - VA NCA Ft Bliss campus Expansion/ET23_24001019.06_VA NCA_250904-18528-MAINT_C.rvt

R1

LEVEL

FIRST

LEVEL

100'-0"
100'-0"

COMMUNICATIONS ROOM EQUIPMENT LAYOUT - TE/2

N

1/2" = 1'-0"

KEYNOTES:

ORT H

1.

N

MOUNT CAMERA TO UNDERSIDE OF CABLE TRAY.

ORT H

COMMUNICATIONS ROOM PATHWAY LAYOUT - TE/2

1/2" = 1'-0"

COMMUNICATIONS ROOM RACK LAYOUT - TE/2

1" = 1'-0"

KEYNOTES:

KEYNOTES:

1.

1.
2.
3.

2.
3.

INSTALL LADDER RACK VERTICALLY ON WALL BETWEEN SC-CAB-2 TO TOP OF SC-CT-1 ABOVE. REFER TO 5/T301 FOR MORE INFORMATION.
INSTALL LADDER RACK VERTICALLY ON WALL FROM BASE OF TTB TO TOP OF SC-CT-1 ABOVE. TWO (2) 2" CONDUITS PENETRATING WALL FROM HANDHOLE OUTSIDE. REFER TO CIVIL DRAWINGS CU102 FOR CONDUIT CONTINUATION.

4.

SC-GND-3 TO BE MOUNTED ON REAR OF RACK AT TOP RACK MOUNTING LOCATION. RACK SPACE RESERVED FOR FUTURE EQUIPMENT.
UPS RESERVED FOR SECURITY NETWORK SWITCH. CONTRACTOR TO SIZE UPS PER SPECIFICATIONS AND PROVIDE