J-1 W-MKC Weed Statement of Work
Updated
A PDF document (417 KB) attached to Consolidated Weed Control for Western Side of Kansas City District Facilities, from the Federal Aviation Administration. Due Nov 6, 2026, 5:00 PM (UTC-5).
File name: J-1 W-MKC Weed SOW.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
Chemically Controlled Vegetation Management
for the Western Kansas City District
Work Summary
The Contractor shall provide all labor, materials, services, equipment, supervision, and insurance required to sterilize soil (herbicide treatment) in the areas identified in attached area charts.
Vegetation control shall consist of one (1) initial solid application to bare ground and three (3) touch-up applications per contract year. All applications shall achieve a minimum 90 percent vegetation kill rate within 30 days of application. If the required kill rate is not achieved, the Contractor shall reapply the treatment at no additional cost to the Government. Such reapplications shall not count toward the required touch-up applications.
Applications shall be spaced appropriately throughout the growing season. The initial solid application shall occur during the February–March timeframe, unless otherwise stated in the site-specific Statement of Work (SOW).
All materials and procedures shall comply with local, state, and federal regulations.
1. Working Hours
All work shall be performed between normal business hours of 7:00 AM to 3:30 PM, Monday through Friday, excluding Federal holidays, unless otherwise specified in the site-specific SOW.
2. Contractor’s Responsibilities
The Contractor shall provide a minimum of three (3) days advance notice prior to herbicide application so that FAA personnel can provide required site escort.
3. Property Damage
The Contractor shall take all precautions to prevent damage to Government property. Any damage to Government property caused by the Contractor shall be repaired or restored to its original condition, or better, at no cost to the Government. The Contractor shall also take precautions to prevent damage to adjacent non-Government property. Any damage caused to non-Government property shall likewise be repaired at no expense to the Government.
4. Working Conditions
The Contractor shall take all necessary precautions to avoid disruption of FAA
operations or services at the facilities.
5. Cleanup
The Contractor shall always maintain the site in a clean and safe condition. Upon completion of each application, the Contractor shall remove and properly dispose of all debris, containers, and waste materials generated by the work. The area shall be left clean and acceptable to the Government.
6. Work to be Accomplished
The Contractor shall provide emergent and pre-emergent herbicides as necessary for control of vegetation including, but not limited to:
The beginning of the document. Download the full file to read on.