J-2 Work Specification Package
Updated
A PDF document (6.3 MB) attached to U.S. Navy Vessel Voyage Repair Availability (VRA), from the Department of the Navy. Due Nov 2, 2026, 2:00 PM (UTC+1).
File name: J-2 Work Specification Package.pdf
The full file is for paid members, or buy this bid alone.
Preview
Print Date: 10/07/2026
USNS T WHITNEY
( LCC 20 )
VRA 4th Qtr
VRA-12/01/2026
WORK ITEM INDEX REPORT
Item Number
Title
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
0023
LCC-NSP-INTENT SCOPE GEN REQUIREMENTS DEFINITIONS
REV MAY 16
LCC-CCSI-GAS FREE CERTIFICATES
LCC-CCSI-HAZARDOUS MATERIAL USE AND DISPOSAL
SECTION 0100
HULL AND STRUCTURAL
0173A
0199
LCC-CCSI-PRESERVE AND PAINT 2K SQFT TOPSIDE (1 YR)
LCC-CCSI-PRESERVE AND PAINT 2K SQFT MACHINERY SPACES
(1 YR)
LCC-VR- STEEL REPAIRS (26-0152 & 26-0222)
SECTION 0400
COMMUNICATION AND NAVIGATION
0401
LCC_VR_26-0212 BAROMETER CALIBRATION
SECTION 0500
AUXILIARY MACHINERY
0502
LCC-VRR26-0177 (SMART) - FIRE ROOM LP DRAIN PIPING
REPAIRS
LCC-VR-26-0183, 0184 & 0185 LPAC HOSE HYDROSTATIC
TESTING
0020
0173B
0510
Category
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0601
LCC-VRR-PRC REPLACEMENT
LCC-VRRs-INSULATION REPAIRS
LCC-VRR-CPO GALLEY RELIEF VALVE HYDROSTATIC
TESTING
0611
0621
SECTION 0800
HVAC
0805
LCC-VRR-HVAC DUCT REPAIRS (VR26-0214)
NSP
NSP
NSP
A
A
A
A
A
A
A
A
A
A
USS Mt Whitney
( LCC 20 )
GENERAL SERVICES AND REQUIREMENTS
ITEM NO. 0001
CATEGORY "N"
INTENT SCOPE GEN REQUIREMENTS
DEFINITIONS REV MAY 16
1.
CONTRACT NO. AW-TBD
2026-09-02
Simpson, Eric H.
ABSTRACT
1.1. This item describes the intent, scope, general requirements, and definitions that apply to this Work Package.
2. REFERENCES
2.1. MSC Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs)
2.2. Enclosures: None
3. ITEM LOCATION/DESCRIPTION:
3.1. Aspects of the ship and shore support facilities as described in the work package.
4. GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None
5. NOTES: None
6. QUALITY ASSURANCE REQUIREMENTS: None Additional
7. STATEMENT OF WORK REQUIRED
7.1. SCOPE
7.1.1. This Work Package, accompanying contract, and contract guidance drawings define the scope of work to be performed.
7.1.2. In case of a difference or conflict between the referenced contract guidance drawings and the work items, the work items shall govern. Any omissions from the drawings, or from this work package, of details or work that is necessary to fulfill the intent of this work package or that is customarily performed in the industry, do not relieve the contractor from his/her obligation to perform such work.
7.1.3. Prepare working drawings, submit them to the MSCREP and Regulatory Bodies for approval, and accomplish work in accordance with the working drawings as approved. Working drawings shall be approved prior to commencement of any work requiring such
The beginning of the document. Download the full file to read on.