4/7/2020
CH27
CH27
ESH Manual CH27
Chapter 27
Cranes, Hoists, and Rigging Safety
Approved by Michael Kincaid
Revised 12/18
27.1 Policy
27.2 Scope
27.3 Applicability
27.4 Roles and Responsibilities
27.5 Definitions
27.6 Required Work Processes
Work Process A. General Requirements for Crane Operation Work Process B. Procurement and Maintenance of Cranes and Hoisting and Rigging Equipment Work Process C. Authorization and Qualification to Use Cranes Work Process D. Restricted Operations
Work Process E. Mobile Cranes
Work Process F. Crane Inspections
Work Process G. Rigging and Other Below-the-Hook Devices and Fixtures
27.7 Standards
27.8 Related ESH Manual Chapters
27.9 References
Appendix A. Typical Pre-use Inspection Tags
NOTE:
Denotes a new section.
Denotes the beginning of changed text within a section.
Denotes the end of changed text within a section.
27.1 Policy
Persons involved in crane or hoist operations at Lawrence Berkeley National Laboratory (Berkeley Lab) must:
https://docs.google.com/document/u/1/d/e/2PACX-1vRWPTlfXeDq36uLYwMxWsjfCeErqdfjqpd4Ay3yBDBJuUYlHZqreaKBP-0wpgdUzWPIeeCgcf…
4/7/2020
CH27
● Be aware of the hazards related to the equipment and the load ● Know the methods for controlling those hazards
● Follow the proper operating procedures applicable to the type of lift and equipment The designated operator must be qualified and authorized to use specific equipment. Crane, hoist, and rigging equipment must be procured through the Facilities Division or from a Berkeley Lab approved vendor, as well as properly inspected, tested, and maintained.
27.2 Scope
Berkeley Lab’s Crane Safety Program is implemented through planning, authorization, qualification, and the appropriate use of properly inspected and rated hoisting equipment and rigging. Lifting and moving loads with forklifts is covered in ESH Manual, Chapter 28, Forklifts and Other Powered Industrial Trucks. Construction operations involving cranes are covered in Chapter 10, Construction Safety.
27.3 Applicability
This policy establishes requirements for Berkeley Lab’s Crane, Hoisting, and Rigging Safety Program and applies to work with any crane or hoist operated at Laboratory-owned or -leased property, as well as Laboratory-managed field research. This program applies to the following Berkeley Lab personnel:
1. Employees
2. Affiliates
3. Construction contractors
4. Non-construction contractors and vendors
27.4 Roles and Responsibilities
Role
Responsibility
Supervisors and
● Ensure that personnel know how to safely operate cranes and
The beginning of the document. Download the full file to read on.
Other documents in this bid
- LBNL Electrical Equipment Build Standard V6
- LBNL Facilities Master Specifications.11 600 Volt Conductors and Cable
- LBNL Facilities Master Specifications Low-Voltage Electrical Power Conductors and Cables
- LBNL ES H Manual Chapter 43 Non Ionizing Radiation
- LBNL PUB 3111 Quality Assurance Program Description
- Appendix A Electrical Equipment Hazard Labeling
- Appendix B Electrical Equipment Fabrication
- Appendix C Ground Hook Safety
- Appendix D Rack Build Standard
- LBNL Electrical Safety Manual Revision 1
- LBNL RPM on Safe Electrical Installations Policy
- LBNL ES H Manual Chapter 08 Electrical Safety Program