PERFORMANCE WORK STATEMENT (PWS)

Pearl Harbor Naval Shipyard
& Intermediate Maintenance Facility (PHNSY & IMF)
Calibration Of Proof Test Machines
1.0

BACKGROUND

1.1

2.0

Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls and repairs various vessels of the U.S. Navy. Its industrial operations provide the U.S. naval forces with a wide range of services and resources located on the island of Oahu, Hawaii, with direct and indirect support to submarines, surface vessels and shore-based activities in the Pacific.

OBJECTIVE & SCOPE

2.1

PHNSY & IMF requires annual services for Government-owned equipment critical to its industrial operations. To ensure operational readiness and safety, this equipment must be maintained to manufacturer specifications through expert calibration, preventative maintenance and as-needed remedial repairs. The objective of this contract is to procure the comprehensive services required to calibrate, provide preventative maintenance and as-needed remedial repairs of three (3) Governmentowned Roberts Testing Proof Test Machines to ensure their accuracy, reliability, and safe operation. The Contractor shall provide all necessary labor, materials, and expertise to perform comprehensive calibration, preventative maintenance and as-needed remedial repair services on the Governmentowned equipment specified below. Equipment: Proof Test Machines
Manufacturer: Roberts Testing
Quantity: Three (3)
1. Vertical Proof Test Hoist Stand, Model 80,000 lbf.
2. Horizontal Proof Test Bed Machine, Model 225,000/50,000 lbf. 3. Horizontal Proof Test Bed Machine, Model 1,200,000/45,000 lbf.

Location: PHNSY & IMF, Controlled Industrial Area (CIA). Services shall be completed by Close of Business (COB) on January 28th of each year for the duration of the contract. The Government reserves the right to change the required date of service completion with a minimum of fourteen (14) calendar days' advance notice to the Contractor.

3.0

PERFORMANCE REQUIREMENTS

3.1

The contractor shall provide all management, parts, labor, materials, supplies and tools required to perform on-site calibration preventative maintenance and as-needed remedial repairs of all equipment in paragraph 2.1.

3.2

The contractor must utilize the existing Vishay Indicators and LCp- 200 Proof Testing System Software on the PHNSY & IMF supplied laptop computers to do the necessary calibrations to all

The beginning of the document. Download the full file to read on.