Performance Work Statement
Updated
A PDF document (394 KB) attached to Repair of the E-3/C-130H Power Supply, from the Department of the Air Force. Due Oct 28, 2026, 3:00 PM (UTC-5).
File name: PWS.pdf
The full file is for paid members, or buy this bid alone.
Preview
13 MAY 2026
DEPARTMENT OF THE AIR FORCE
AIR FORCE SUSTAINMENT CENTER
TINKER AIR FORCE BASE, OKLAHOMA 73145
Performance Work Statement (PWS)
TYPE OF WORK: Repair of E-3 GINS / C-130H Power Supply
PURCHASE REQUEST: FD2030-26-01861
REVISION: 00
DATE:
PREPARED BY:
Nicholas Ajimine
422 SCMS/GUME
TINKER AFB, OK. 73145-3031
DSN 336-2926
REVISION SHEET
i
FD2030-26-01861
13 MAY 2026
Note: All revisions to the contents of this PWS will now be listed on this Revision Sheet. The original content of this PWS will not be removed, but will be superseded or added to by the paragraph revisions shown on this page.
Revision Date
Paragraph
Paragraph is added or revised to read as follows:
Original
ii
FD2030-26-01861
13 MAY 2026
PREFACE SHEET
END ITEM RECEIVED AS
END ITEM TO BE DELIVERED AS
END ITEM
NOMENCLATUR
E
NATIONAL
STOCK NO(S)
PART NO(S)
NATIONAL
STOCK NO(S)
PARTS NO(S)
Power Supply
6130-01-436-0627
154BS101-1
SAME
SAME
iii
FD2030-26-01861
13 MAY 2026
REVISION SHEET
i
PREFACE SHEET
iii
iv
DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1
PURPOSE
1.2
INITIAL PRODUCTION EVALUATION (IPE) REQUIREMENTS
1.3
QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.4
SUPPLY CHAIN RISK MANAGEMENT
1.5
FOREIGN INFLUENCE
1.6
OBSOLESCENCE STATEMENT
1.7
CYBERSECURITY
1.8
CONDEMNATION CANDIDATES
1.9
SUPPORT EQUIPMENT (SE), INCLUDING SPECIAL TOOLS (ST) AND SPECIAL
TEST EQUIPMENT (STE)
1.10
PRECIOUS METALS RECOVERY PROGRAM
1.11
NUCLEAR HARDNESS REQUIREMENT
1.12
CONFIGURATION MANAGEMENT
1.13
PARTS CONTROL PROGRAM
1.14
COUNTERFEIT PREVENTION PLAN (CPP).
1.15
OZONE DEPLETING SUBSTANCES (ODS)
1.16
LEAD (Pb) FREE ELECTRONICS
1.17
TECHNICAL ORDER MAINTENANCE N/A
1.18
CONTRACTOR IDENTIFICATION
1.19
GENERAL WORK REQUIREMENTS
1.20
SPECIFIC WORK REQUIREMENTS
1.21
SPECIAL REQUIREMENTS
1.22
SAFETY AND HEALTH REQUIREMENTS
1.23
PRODUCTION SURGE/CAPABILITIES ANALYSIS PLAN
1.24
MISSION ESSENTIAL SERVICES
1.25
DELIVERY SCHEDULE
iv
FD2030-26-01861
13 MAY 2026
1.26
INFORMATION REQUESTS
1.27
REPORTING REQUIREMENTS
2.1
SERVICE SUMMARY
SERVICE SUMMARY
GOVERNMENT PROPERTY
3.1
GOVERNMENT FURNISHED MATERIAL, EQUIPMENT, AND PROPERTY
3.2
DISPOSITION OF GOVERNMENT PROPERTY
3.3
REPORTING LOSS OF GOVERNMENT PROPERTY
3.4
DISCREPANCIES INCIDENT TO SHIPMENT
APPENDIX A
Definitions
APPENDIX B
Applicable Documents, Technical Orders, Directives, and Technical Guidance
APPENDIX C
Data Item Description (DID) List
APPENDIX D
Category of Repair Descriptions
APPENDIX E
Commercial Asset Visibility Air Force
v
FD2030-26-01861
13 MAY 2026
1 DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1
1.1.1
1.2
PURPOSE
The purpose of the Performance Work Statement (PWS) is to define the repair requirements for
The beginning of the document. Download the full file to read on.