Performance Work Statement
Updated
A PDF document (283 KB) attached to PRE-SOLICITATION NOTICE: 415 SCMS Transmitter IDIQ, from the Department of the Air Force. Due Nov 5, 2026, 12:00 PM (UTC-7).
File name: Performance Work Statement (PWS) 14 October 2026.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF THE AIR FORCE
OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820
PERFORMANCE WORK SPECIFICATION (PWS)
1.0 SCOPE OF WORK: For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair. 1.1 TEST, TEARDOWN, AND EVALUATION (TT&E) (FFP): The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, approval to repair will be negotiated. If no further repair is required, the asset must be returned in serviceable like new condition. 1.2 REPAIR (NTE): The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable like new condition.
1.3 OVER & ABOVE (O&A) WORK AUTHORIZATION PROCESS: Over and Above (O&A)
work may be allowed ONLY for the TWT component with its associated costs (e.g. installation, labor). Upon completion of the TT&E effort, the contractor shall identify and report to the government all units requiring O&A. Once the contractor receives the quote from the supplier, that quote shall be forwarded to the government with an official request. All cost breakdowns and associated documents shall be included with the request. The PCO will review, make a determination and negotiate the final price. All other work falls under the scope of the repair (paragraph 1.2).
Below listed item(s) will be shipped to contractor to repair (listed by approved repair source): Table 1. (Transmitter Description)
Item Description
Transmitter, Radar
(AN/MST-T1(V) MINIMUTES)
Transmitter, Radar
(AN/TSQ-T10 Joint Threat
Emitter)
The beginning of the document. Download the full file to read on.