Request for Quotation 15B41226Q00000006
Install Above Ground Tanks – FMC Rochester
Questions and Answers
Question 1:
What are the capacities/sizes of the two existing
underground storage tanks for gasoline and diesel?
Question 2:
Approximately how many gallons of gasoline and diesel are currently remaining and expected to be pumped out and
removed?
BOP Response: Clarification or Change
Gasoline tank is 4000 gallons.
Diesel tank is 2000 gallons.
BOP Response: Clarification or Change
Depending on start date, we will plan on having less than 1000 gallons of gasoline to be transfered to a temp tank for the duration of the project.
Roughly 1200 gallons of diesel will need to be pumped out and disposed of.
Question 3:
Are the concrete and bollards by the cement contractor? Also, what about electrical?
BOP Response: Clarification or Change
There are no project drawings. Concrete and Bollards- see page 3 of the specs. Electrical- See page 4 of the specs.
Question 4:
Are there specs and drawings available for the bid process?
BOP Response: Clarification or Change
The specs are located in the solicitation. A site map will be added to the solicitation.