Home / FMC Rochester- Install Above Ground Tanks / Document

Questions and Answers

Updated

A PDF document (111 KB) attached to FMC Rochester- Install Above Ground Tanks, from the Federal Prison System / Bureau of Prisons. Due Nov 19, 2026, 5:00 PM (UTC-6).

File name: Questions and Answers.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Request for Quotation 15B41226Q00000006
Install Above Ground Tanks – FMC Rochester
Questions and Answers
Question 1:

What are the capacities/sizes of the two existing
underground storage tanks for gasoline and diesel?

Question 2:

Approximately how many gallons of gasoline and diesel are currently remaining and expected to be pumped out and
removed?

BOP Response: Clarification or Change
Gasoline tank is 4000 gallons.
Diesel tank is 2000 gallons.

BOP Response: Clarification or Change
Depending on start date, we will plan on having less than 1000 gallons of gasoline to be transfered to a temp tank for the duration of the project.
Roughly 1200 gallons of diesel will need to be pumped out and disposed of.

Question 3:
Are the concrete and bollards by the cement contractor? Also, what about electrical?

BOP Response: Clarification or Change
There are no project drawings. Concrete and Bollards- see page 3 of the specs. Electrical- See page 4 of the specs.

Question 4:
Are there specs and drawings available for the bid process?

BOP Response: Clarification or Change
The specs are located in the solicitation. A site map will be added to the solicitation.

Question 5:

BOP Response: Clarification or Change

The beginning of the document. Download the full file to read on.

Other documents in this bid