RCH 26Z4AM8 Install Above Ground Tanks Statement of Work CERS Review

Updated

A PDF document (432 KB) attached to FMC Rochester- Install Above Ground Tanks, from the Federal Prison System / Bureau of Prisons. Due Nov 19, 2026, 5:00 PM (UTC-6).

File name: RCH_26Z4AM8_Install Above Ground Tanks_SOW CERS Review (1).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

U.S. Department of Justice
Federal Bureau of Prisons
Facilities Management
Washington, DC 20534

March 13, 2026

MEMORANDUM FOR BENJAMIN HENRY

CONSTRUCTION CONTROL REPRESENTATIVE

ADMINISTRATIVE DIVISION

FROM:

SUBJECT:

signed by
KIMBERLY Digitally

KIMBERLY HUDSON

Date: 2026.03.13

HUDSON

12:31:29 -04'00'
Kimberly Hudson, Chief
Construction and Environmental Review Section

Statement of Work Approval for Project 26Z4AM8
Install Above Ground Tanks

The Construction and Environmental Review Section, Facilities Management Branch, has reviewed and approved the Statement of Work (SOW) to be used for solicitation services at FMC Rochester for Project 26Z4AM8, Install Above Ground Tanks. This SOW specifically addresses the Install Above Ground Tanks, under Project 26Z4AM8 as defined herein and should not be interpreted as an open-ended approval for future, unrelated work.
If you have any additional questions or concerns, please contact Henry Guo, Architect, at [email protected].

STATEMENT OF WORK

Federal Medical Center Rochester- B&F PROJECT 26Z4AM8
Install Above Ground Fuel Tanks
I.

SPECIFICATIONS:

A.

INTRODUCTION

By CERS at 7:48 am, Mar 13, 2026

Removal of Existing Underground Storage Tanks and Installation of New Aboveground Fuel Storage and Dispensing System:
The Federal Medical Center (FMC) located in Rochester, MN 59904 intends to make a single award to a responsible contractor to furnish all labor, equipment, materials, programming, training, and incidental services necessary to remove and install two (2) new above ground diesel/unleaded fuel tanks and two (s) associated existing fuel pumps while integrating a new fuel management system as stated in the following project overview: 1. Properly remove two (2) existing underground storage tanks (USTs) in place. 2. Remove associated fuel system components as required. 3. Install a new aboveground fuel storage system consisting of: •
•
•
4.
5.
6.
7.
8.

One (1) 4,000-gallon unleaded gasoline tank not exceed 14 feet in overall length One (1) 2,000-gallon diesel tank
Both equipped with submersible pumps and controllers

Construct reinforced concrete foundations and a new fuel dispensing island. Install new fuel piping, electrical systems, and protective bollards. Install an integrated fuel management and automated tank monitoring system. Provide seventy (70) fuel access devices compatible with the fuel management system. Provide a temporary 1000 gallon unleaded gas tank and 500 gallon diesel tank with meters for the duration of

The beginning of the document. Download the full file to read on.