Solicitation No
Updated
A PDF document (970 KB) attached to Cableway Crane Refurbishment, from the Bureau of Reclamation. Due Dec 18, 2026, 2:00 PM (UTC-8).
File name: Solicitation_No__140R3026R0010.pdf
The full file is for paid members, or buy this bid alone.
Preview
Solicitation No. 140R3026R0010
Contract No. TBD
Full and Open Competition
Request for Proposal
Cableway Crane Refurbishment
U.S. Department of the Interior
Bureau of Reclamation
Interior Region 8: Lower Colorado Basin
2026
This page intentionally left blank
FOREWORD
Solicitation No.
140R3026R0010
Project Title
Cableway Crane Refurbishment
FOREWORD
The U.S Department of Interior, Bureau of Reclamation, Interior Region 8: Lower Colorado Basin (LCB), is seeking to award a firm-fixed-price contract for the refurbishment of the 150-ton cableway crane at the Hoover Dam. The ground to the middle of the track cables is approximately 600 feet. When work is being completed on the NV tower, the ground is approximately 100 feet below. The track cables spans from the AZ anchorage to behind the NV tower. The length of the track cable is 1,615’, most of which is above the canyon. The principal components of work include: 1. Replace the 6, 3-½" track cables. 2. Replace the 2, 1-1/8” button line cables and button line tensioners 3. Refurbish the existing carriage 4. Install the already fabricated slack carrier 5. Replace sheaves 6. Lubricate all wire ropes 7. Lubricate the hoist house mechanical components and tower sheaves 8. Re-tension the track cables 9. Replace the hydraulic hand pump and lines on the NV side tensioning system 10. Load test the cableway crane 11. Perform an annual inspection and certify the crane. The Work is located at Hoover Dam Powerplant approximately 8 miles northeast of Boulder City, Nevada in Clark County, Nevada and Mohave County, Arizona. Contractors must provide all personnel, equipment, tools, materials, and supervision as well as any additional items and services necessary to provide work as defined in the Specifications This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by Negotiation. Offerors are cautioned to carefully review the offer submission requirements contained in Section L and the evaluation criteria and standards contained in Section M. To be considered qualified for this work, offerors must fully address all evaluation factors. Failure to comply with these requirements may result in a proposal being determined unacceptable. Reference Section L, for instructions and Section M, paragraph M.2 for evaluation factors and acceptability standards. The Government anticipates making award without discussions. This requirement will be issued as FULL AND OPEN COMPETITION (UNRESTRICTED). The
The beginning of the document. Download the full file to read on.